Received: from astro.wisc.edu (pool.astro.wisc.edu [144.92.179.209])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id eAI4rTI3660902;
	Fri, 17 Nov 2000 22:53:30 -0600 (CST)
Message-ID: <3A160DA5.8361E7D9@astro.wisc.edu>
Date: Fri, 17 Nov 2000 23:03:35 -0600
From: Ed Churchwell <ebc@astro.wisc.edu>
X-Mailer: Mozilla 4.7 (Macintosh; I; PPC)
X-Accept-Language: en,pdf
MIME-Version: 1.0
To: churchwell <churchwell@astro.wisc.edu>,
   whitney barbara <bwhitney@colorado.edu>, chip <chip@astro.wisc.edu>,
   mathis <mathis@astro.wisc.edu>, cassinelli <cassinelli@astro.wisc.edu>,
   lazarian <lazarian@astro.wisc.edu>, wolfire <mwolfire@astro.umd.edu>,
   wolff <mwolff@colorado.edu>, dickey <john@ast1.astro.umn.edu>,
   benjamin <benjamin@wisp5.physics.wisc.edu>, seager <seager@ias.edu>,
   clemens <clemens@protostar.bu.edu>, bania <bania@ninkasi.bu.edu>
Subject: [Fwd: Legacy Science Program Results]
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit

Dear SIRTF team,
	I just returned from a very full Visiting Committee 
Meeting of the Arecibo Observatory and found the following 
message.  As you can see it is very good news.  We did it!
However, it isn't all good news.  The MIPS part of the 
program was cut, perhaps with justification.  They do 
say that we might be able to do this later as a large GO
proposal depending on the MIPS detector responses in 
orbit.  The budget has been cut accordingly and we will
have to discuss this.  I propose having a telecon next
Wed.  This will give me time to set up the telecon on 
Monday.  This is the day before Thanksgiving and some of 
you may be away from your office.  Let me know if Wed. will
work.  In the meantime, we all have to start using 
contacts to locate potential post docs for our project.
Congratulations to the whole team.  I look forward to
continuing our productive collaboration that we have 
had so far.  Sorry for the delay in getting this out 
to all of you, but I only just saw it myself.
						Best, Ed

-------- Original Message --------
Subject: Legacy Science Program Results
Date: Fri, 17 Nov 2000 09:12:36 -0800 (PST)
From: SIRTF Science Center HelpDesk <sirtf@ipac.caltech.edu>
To: ebc@astro.wisc.edu
CC: sirtf@ipac.caltech.edu

Dear Ed:

I am pleased to inform you that the IRAC portion of your proposal,
"The SIRTF Galactic Plane Survey," has been approved for
implementation as a component of the SIRTF Legacy Science
Program.  This decision follows from the recommendation offered by
a Science Review Panel and Time Allocation Committee (TAC).  With
a nearly 6:1 over-subscription of SIRTF observing time, only a
small number of proposals were accepted.

I am enclosing a consolidated summary of the Review Panel and TAC
evaluation of your proposal.  The comments represent a consensus
established by qualified peers at a competitive review of all
Legacy Science proposals held October 23-25, 2000 at the SIRTF
Science Center (SSC).  I hope this summary evaluation will be
helpful to you in understanding the perceived strengths and
weaknesses of your proposed investigation.

In my role as the NASA-designated selection official for the SIRTF
Legacy Science Program, I am allocating 400 (four hundred) hours
of SIRTF observing time, primarily in the first year of the
mission, for your project.  This amount of time should be
adequate to carry out the proposed IRAC observations.

The Review Panel and TAC, following careful study and additional
discussions with SSC instrument experts, concluded that the MIPS
portion of the investigation would likely be severely compromised
by saturation and latency effects, particularly at the longer
wavelengths.  I concur with their recommendation to proceed with
the IRAC survey of the inner Galactic Plane as part of the Legacy
Science Program.  When the on-orbit performance of SIRTF and MIPS
is fully characterized, the efficacy of a MIPS survey in the
Galactic Plane can be re-examined.  With this in mind, you should
be aware that the second solicitation for General Observer
proposals, nominally scheduled for May 2003, will likely include
the option of proposing investigations with up to ~200 hours of
SIRTF observing time.

In addition to the SIRTF observing time, I approve the allocation
of an estimated $2,420,000 (two million and four hundred twenty
thousand dollars) in supporting NASA funds, contingent upon
their availability, over the life of the project. This represents
75% of your requested amount, and is deemed by an independent
cost analysis to be sufficient to successfully carry out the
IRAC-only survey.

A revised cost plan and amended proposal should be submitted to
the SSC address listed in the Call for Proposals.  Since some of
the decisions you make in revising the proposed investigation
may depend on discussions with other approved Legacy Science
teams and/or with SSC experts, the revisions can be submitted
after the January Legacy Science Workshop (see below).

In the meantime, I approve the allocation of $186,000 (one
hundred and eighty-six thousand dollars) for a six-month
start-up contract, effective January 1, 2001.  The full funding
level for the first year of your investigation is likely to be
approximately twice this level, and will be negotiated with each
team following the Legacy Science Workshop.

The Jet Propulsion Laboratory, acting as the contracting agent
for the SSC, will immediately begin processing the necessary
paperwork to initiate the start-up contract.  Beforehand, you
should contact Michael D. Bicay, Manager of the SSC Office of
Community Support (mdb@ipac.caltech.edu), as soon as possible and
provide the information requested below.

(1) Confirm whether you want JPL to issue separate start-up
contracts to your Co-Investigator institutions, or whether you
want your home institution to receive all of the funds in
advance of issuing subcontracts to your partners.  If you elect
to have JPL issue awards directly, please confirm whether the
investigators listed in parentheses below are the appropriate
institutional leads (in a contractual sense).

(2) Confirm whether the fractional six-month allocations listed
below are appropriate, given the possible science/budget
re-planning that you will have to undertake following the
January Workshop.  The figures listed here maintain the relative
distribution cited in your original first-year cost plan, but on
a reduced cost basis.  You now have the option of
re-distributing funds among your partners for the first six
months of 2001; that is, to change the allocations listed below.

U. Wisconsin (Ed Churchwell)		$ 131,743
SSI-Boulder (Barbara Whitney)		$  30,670
Boston U. (Dan Clemens)			$  12,784
U. Maryland (Mark Wolfire)		$  10,803
U. Minnesota (John Dickey)		$       0

Six-Month TOTAL			        $ 186,000.

There is no need to submit a revised cost plan at this time; the
start-up contract can be initiated with the original cost plan
and the Email answers to the questions above.

Now that your project has been approved, the SSC is prepared to
assist you and your team, as necessary, to optimize the SIRTF
observational strategy and to maximize the scientific return from
your investigation.  As you will see in the enclosed evaluation,
the Review Panel and TAC devoted considerable effort to
understand the degree of IRAC confusion expected in the survey.
I believe it will be in the interest of your team to carefully
examine, with expert assistance from the SSC, the issue of
confusion and ways to ameliorate its effects.

The TAC also recommended that your team carefully study the issues
of robustness and redundancy in your observational strategy.  SSC
instrument experts are prepared to help your team study these
matters, and to assist you in performing a risk/benefit analysis
of any possible tradeoffs.

The SIRTF Legacy Science Program offers an unprecedented combination
of observing time and supporting NASA funds.  Your team will be able
to implement a large and coherent science investigation that, if
executed successfully, will likely produce a long-lasting legacy.
While the immediate scientific benefits are obviously important, the
approval of your investigation also carries a responsibility to the
larger astronomical community through the broader science enabled by
your SIRTF Legacy Science dataset(s).

In view of the critical importance of these data to the realization
of SIRTF's full potential as a national and international resource,
the TAC recommended that approved investigators work with SSC
experts to "ensure that their data are obtained and processed  with
the quality and timeliness to fulfill their promise."  With that goal
in mind, I offer you the necessary institutional expertise to
improve the implementation of your project (as needed), while
protecting the original scientific intent of your investigation.

I invite you to attend an invitation-only Legacy Science Workshop to
be held at the SSC in Pasadena on January 12-13, 2001.  These dates
are the Friday and Saturday immediately following the winter meeting
of the American Astronomical Society in San Diego.  This meeting
will serve as the initiation of the SIRTF Legacy Science Working
Group, and will bring together the Principal Investigators of the
approved projects with representatives from the SIRTF Instrument
Teams and the SSC.  One purpose of this Workshop is to identify
areas of mutual scientific and/or technical interest between teams
and possibly between teams and science instrument experts.  You may
wish to invite one (or possibly two) additional Co-Investigators to
attend the Workshop.

The agenda for the Workshop is still being developed.  I anticipate
that the Friday morning will be devoted to an executive session
with the Principal Investigators only.  Friday afternoon will be
devoted to an overview of each of the approved projects, with
subsequent discussions intended to identify possible areas of
overlap.  The Saturday focus will be on breakout sessions with
other Legacy Science investigators and instrument experts, based on
mutual science interests and instrument usage. These sessions will
be scheduled serially to avoid the need to bring large groups of
investigators to this Workshop.

Let me congratulate you and your team on submitting an excellent
Legacy Science proposal.  On behalf of the SSC, I look forward to
working with you to assure a successful completion of your project
in the coming years.

The SSC and JPL are developing a coordinated press release
announcing the Legacy Science selections.  It is anticipated that
this NASA news release will be issued in December.  If your home
institution (or that of any Co-Investigator) intends to release a
parallel announcement, I ask that you coordinate the timing of such
a release with Dr. Bicay at the email address cited earlier.

If you have additional questions regarding the evaluation or the
review process, please contact me at 626.395.8000.


Sincerely,

B. T. Soifer, Director
SIRTF Science Center
California Institute of Technology

===================== START EVALUATION ====================

Overall Rating:				Excellent

(1) Scientific Merit			Excellent
(2) Enabling Science			Excellent
(3) Technical Merit			Good
(4) Products / Tools			Excellent
(5) Organize / Manage			Excellent


Criterion (1): The overall scientific merit of the proposed project,
its contribution to maximizing the overall scientific return of
SIRTF, and the uniqueness of the utilized SIRTF capabilities in
advancing knowledge in the proposed area of research.


Major Strength(s):
The proposal was very highly rated because of the scientific utility
of the catalogs that will be produced, as well as the science
directly resulting from the program.  The promised data products
will be a 'gold mine' for Galactic research.  The catalogs,
containing millions of point and extended sources, will be among the
most heavily utilized datasets produced by SIRTF.

This survey will provide key information about Galactic Structure 
and star-forming regions in the Galactic plane.  It will produce a
complete census of star-forming regions (SFRs) over a large (240
square degree) portion of the Galactic disk, in order to measure key
stellar and galactic parameters, including: stellar luminosity and
mass functions, disk  scale length, inner arms and bar, and
populations of embedded OB stars.

The infrared imaging plus HI and CO radial velocities provide an
important set of test particles for mapping the Galactic potential.
The survey should detect several thousand SFRs, and will map the bar
and molecular ring in the inner Galaxy, the richest region of star
formation.

Minor Strength(s):
This study will determine the near and mid-infrared interstellar
extinction law, and may detect other stellar and nebular sources,
including supernova remnants and planetary nebulae.  The large
survey area should produce many serendipitous discoveries (globular
clusters, hidden galaxies, etc.).

Major Weakness(es):
None

Minor Weakness(es):
The authors may be slightly optimistic about resolving the young
stellar clusters, which have sizes nearer to 0.1 pc, rather than
the 1 pc cited in the proposal.
 

Criterion (2): The extent to which the project will facilitate
subsequent SIRTF investigations, either observational or
interpretive, and the extent to which the project data will
support broader-based research by the scientific community.

Major Strength(s):
This project will produce some of the most-cited catalogs from
SIRTF.  It will initially produce a bright source catalog (>2 mJy
for IRAC).  This will be useful as an inventory for Galactic
structure and for identifying candidates for follow-up IRS
spectroscopy and MIPS observations.  The larger Faint Source Catalog
and the Extended Source Catalog will contain approximately 10^8
objects.  This survey will facilitate subsequent observations with
MIPS, in selected directions, of OB associations that may be
obscured in the near-infrared.  The IRAC survey will identify the
locations of young stellar objects and mass-losing evolved stars,
for follow-up studies at longer wavelengths.

In addition to the excellent science described in the proposal, data
from this survey will be the starting point for a broad range of
exciting SIRTF science programs.

Minor Strength(s):
Overlap with other Galactic plane large-scale surveys in HI and CO,
which are described in the ancillary data section.

Major Weakness(es):
None.

Minor Weakness(es):
None.


Criterion (3): The overall technical merit of the proposed project,
and the likelihood of achieving its stated scientific goals in a
timely manner.

Major Strength(s):
With assistance and advice from the SIRTF Science Center, this
Galactic plane survey with IRAC should achieve its goals for over
99% of the inner Galaxy.

Minor Strength(s):
None.

Major Weakness(es):
The proposed MIPS scan data are expected to be compromised by
saturation and latency effects.  The panel recommends excising the
MIPS portion of this proposal. When more information is available
about SIRTF and MIPS performance, this might be an excellent
subsequent large-scale General Observer investigation.

Minor Weakness(es):
The proposal did not adequately address the issue of IRAC saturation
in the Galactic plane.  Members of the panel accessed the MSX data
during the review in an effort to understand better the severity of
IRAC saturation in the Galactic plane. In the 8 micron band, MSX
sources were extracted down to approximately 50-100 mJy, which is
below the saturation limit for the IRAC 8 micron band.  Looking at
an expected worst case for the regions to be surveyed (l=10, b=0),
we found a source density of around 400 per square degree at this
level.  An IRAC frame is 0.0069 square degrees, so we expect about
3 MSX sources per IRAC image.  If we assume that a saturated point
source fully compromises 10 pixels, this would be 30 saturated IRAC
pixels per frame, or a small fraction (0.046%) of all pixels.  If
we then assume that every saturated pixel is fully compromised in 5
subsequent frames, then 0.27% of all pixels will be compromised by
saturation and residual images.

We note that these are worst case scenarios.  Source densities are
much lower at larger longitude.  Of the MSX sources, only a
fraction will exceed the ~150 mJy saturation limit in the IRAC 8
micron band.  A smaller fraction will be saturated at a level that
will result in significant residual image in subsequent frames.
For most of the survey region, we estimate that <<0.1% of pixels
will be affected by saturation of residual image.

We also addressed the question of the level of diffuse background.
In the worst case (again, 1= +10, b=0), we found a median
background in the MSX data of ~4 x 10(^-6) W/(m^2 sr), which
corresponds to a few mJy per beam in the IRAC data, two orders of
magnitude below saturation.

The strategy for avoiding asteroid contamination was not addressed
in the proposal.

Additional Comments: 
The committee believes that this team needs to work closely with
the SSC staff in order to understand the issues of IRAC
saturation and to optimize survey strategy.  The team should
address issues of robustness of the survey strategy they propose
to employ.


Criterion (4): The extent to which the project proposes to develop
post-pipeline data products and/or software analysis tools that
will enrich the overall scientific return from SIRTF.

Major Strength(s):
The team will accumulate over 34,000 IRAC pointings over the inner
Galaxy. From these, they will produce a series of source catalogs.
Their Bright Source Catalog will be extremely useful for SIRTF
observers, and will be available in time for guest observer
proposals.  The Point Source and Extended Source Catalogs will also
appear soon after the completion of data acquisition.

The team will develop image mosaics, in the IRAF environment, to
address the multiple rotated images.  They will also provide several
web-based tools for modeling PDRs and IR dust emission.

Minor Strength(s):
None.

Major Weakness(es):
None.

Minor Weakness(es):
None.


Criterion (5): A realistic and credible plan that describes how
the Principal Investigator will organize and manage the
scientific, technical and financial aspects of the project.

Major Strength(s):
The management appears to be strong, with several key individuals
identified to lead the major science efforts.  Team meetings at
Wisconsin and progress reviews are scheduled frequently.  This will
be important to address the survey design, and the transition to
scientific working groups.

The management plan is set up to ensure timely delivery of the data 
products.

Minor Strength(s):
None.

Major Weakness(es):
None.


From - Wed Jan 17 20:01:10 2001
Received: from hydra.ipac.caltech.edu (hydra.ipac.caltech.edu [134.4.10.102])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f0I0QAd2171379;
	Wed, 17 Jan 2001 18:26:10 -0600 (CST)
Received: from sscsci9 (sscsci9.ipac.caltech.edu [134.4.60.71])
	by hydra.ipac.caltech.edu (8.9.3/8.9.3) with SMTP id QAA16882;
	Wed, 17 Jan 2001 16:25:40 -0800 (PST)
Message-Id: <200101180025.QAA16882@hydra.ipac.caltech.edu>
Date: Wed, 17 Jan 2001 16:25:39 -0800 (PST)
From: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Reply-To: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Subject: Re: report from SSC SIRTF Legacy meeting in Pasadena
To: ebc@astro.wisc.edu, chip@astro.wisc.edu
Cc: churchwell@astro.wisc.edu, bwhitney@colorado.edu, mathis@astro.wisc.edu,
   lazarian@astro.wisc.edu, cassinelli@astro.wisc.edu, mwolfire@astro.umd.edu,
   wolff@colorado.edu, john@ast1.astro.umn.edu,
   benjamin@wisp5.physics.wisc.edu, seager@ias.edu, clemens@protostar.bu.edu,
   bania@ninkasi.bu.edu, jackson@slime.bu.edu, chip@astro.wisc.edu,
   meade@sal.wisc.edu, brian@sal.wisc.edu, sirtf@ipac.caltech.edu
MIME-Version: 1.0
Content-Type: TEXT/plain; charset=us-ascii
Content-MD5: 4ud57TNm77lMBAmtjWiuqQ==
X-Mailer: dtmail 1.2.1 CDE Version 1.2.1 SunOS 5.6 sun4u sparc 
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000


Chip et al,
Sorry for delay -- in meetings much of today.
Here are answers to at least most of your questions.

1. Latency/saturation -- the best info is still that in the SIRTF Observers 
Manual. Residual images remain on the array.
30 seconds after looking at a very bright object (providing full well) there are 
residuals of 0.6%, 1.1%, 2.1% and 3.7% respectively in channels 1, 2, 3 and 4.
These disappear after 270 seconds. Amplitude of image does not scale well with 
source brightness. But light saturation leads to negligible to 0.3% residuals of 
full well 30 seconds after viewing.
The whole issue is likely to be looked at again in the near future to try to get 
a better handle on these numbers.
2. The new IRAC AOT of 2secs + 0.4secs (basically the HDR option without the 12 
second integration) is getting strong play. It appears it will be a relatively 
easy fix for the uplink folks. Hasn't been to downlink yet.
3. Data format will be single plane FITS files. The headers will be "sensible" 
(provide calibration and RA and Dec positions in the BCD products). The full 
list of headers in the final products is not yet settled and may not be for 4 to 
6 months. I suggest designing a "flexible" system. Raw and intermediate pipeline 
products will also be available (after each "correction" in the pipeline a data 
product is produced), although you may not want to deal with these too much.
4. Move and read out is certainly possible. Actually, read out is almost 
instantaneous. The problem is time taken in data transfer to the spacecraft and 
data compression.
5. It is believed that the flats will be very stable (<1%?) but this won't 
really be known until IOC has occurred. The dark current is negligible (up to 10 
electrons per day!).
6. Background and zodiacal light. This information is available for different 
areas of the sky using SPOT (this is based on Bill Reach's model, probably the 
best around). If you are unfamiliar with SPOT, you might like to check it out 
soon. You will need to submit all your AORs with it later this year. If you need 
large-scale models of the sky background please let me know and I will see what 
we can do (it should be feasible to get an accurate map in a relatively short 
turnaround time).
Cheers
Tony.
**************************************************
A.P.Marston			Tel: 626-395-3507
Observer Support
SIRTF Science Center, IPAC
Caltech,
Pasadena, CA 91125
**************************************************

From - Tue Jan 16 14:42:11 2001
Received: from hydra.ipac.caltech.edu (hydra.ipac.caltech.edu [134.4.10.102])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f0GKdxd2099436;
	Tue, 16 Jan 2001 14:39:59 -0600 (CST)
Received: from sscsci9 (sscsci9.ipac.caltech.edu [134.4.60.71])
	by hydra.ipac.caltech.edu (8.9.3/8.9.3) with SMTP id MAA00145;
	Tue, 16 Jan 2001 12:39:49 -0800 (PST)
Message-Id: <200101162039.MAA00145@hydra.ipac.caltech.edu>
Date: Tue, 16 Jan 2001 12:39:49 -0800 (PST)
From: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Reply-To: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Subject: Re: report from SSC SIRTF Legacy meeting in Pasadena
To: ebc@astro.wisc.edu, chip@astro.wisc.edu
Cc: churchwell@astro.wisc.edu, bwhitney@colorado.edu, mathis@astro.wisc.edu,
   lazarian@astro.wisc.edu, cassinelli@astro.wisc.edu, mwolfire@astro.umd.edu,
   wolff@colorado.edu, john@ast1.astro.umn.edu,
   benjamin@wisp5.physics.wisc.edu, seager@ias.edu, clemens@protostar.bu.edu,
   bania@ninkasi.bu.edu, jackson@slime.bu.edu, chip@astro.wisc.edu,
   meade@sal.wisc.edu, brian@sal.wisc.edu, sirtf@ipac.caltech.edu
MIME-Version: 1.0
Content-Type: TEXT/plain; charset=us-ascii
Content-MD5: 7HlWeYZYVNeZdKjvvZzRFA==
X-Mailer: dtmail 1.2.1 CDE Version 1.2.1 SunOS 5.6 sun4u sparc 
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000

A quick note.
I have just had a conversation with Bill Reach (team lead for the IRAC 
instrument support team). It appears we are one step nearer implementing an 
option that would provide 0.4s and 2s options (like the high dynamic range 
option without the 12s integration). The total time fof a frame (including slew 
and settle) is estimated at 18 secs. There is an issue regarding data 
compression on board the space craft. This could add as much as 15 secs to
the total time per position (or per dither). Incidentally, Bill recommends two 
dithers per position.

So 
1 dither per position = 18 secs (or 33 secs if data compression is slow).
2 dithers per position = 36 secs (or 66 secs if data compression is slow).

I know the factor of 2 in time is a problem here, but the data compression
issues is one involving the spacecraft rather than IRAC. The issue should
be resolved relatively shortly.

My question to you is do you still want to push for a 2secs integration time?
If you do then it is very likely to happen. It does mean quite a bit
of idle (non-data taking) time for the instrument which concerns some people 
around here.

Cheers
Tony

P.S. For our records we are trying to keep track of information flow between 
liaison scientists and Legacy groups by cc'ing info to our helpdesk 
(sirtf@ipac.caltech.edu). Please cc messages to this address. If you would 
rather send a private message to me, then you might want to avoid this cc.

**************************************************
A.P.Marston			Tel: 626-395-3507
Observer Support
SIRTF Science Center, IPAC
Caltech,
Pasadena, CA 91125
**************************************************

From - Tue Jan 16 12:58:41 2001
Received: from hydra.ipac.caltech.edu (hydra.ipac.caltech.edu [134.4.10.102])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f0GH2Gd2093295;
	Tue, 16 Jan 2001 11:02:16 -0600 (CST)
Received: from sscsci9 (sscsci9.ipac.caltech.edu [134.4.60.71])
	by hydra.ipac.caltech.edu (8.9.3/8.9.3) with SMTP id JAA26523;
	Tue, 16 Jan 2001 09:02:00 -0800 (PST)
Message-Id: <200101161702.JAA26523@hydra.ipac.caltech.edu>
Date: Tue, 16 Jan 2001 09:01:59 -0800 (PST)
From: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Reply-To: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Subject: Re: report from SSC SIRTF Legacy meeting in Pasadena
To: ebc@astro.wisc.edu, chip@astro.wisc.edu
Cc: churchwell@astro.wisc.edu, bwhitney@colorado.edu, mathis@astro.wisc.edu,
   lazarian@astro.wisc.edu, cassinelli@astro.wisc.edu, mwolfire@astro.umd.edu,
   wolff@colorado.edu, john@ast1.astro.umn.edu,
   benjamin@wisp5.physics.wisc.edu, seager@ias.edu, clemens@protostar.bu.edu,
   bania@ninkasi.bu.edu, jackson@slime.bu.edu, chip@astro.wisc.edu,
   meade@sal.wisc.edu, brian@sal.wisc.edu, tmarston@ipac.caltech.edu
MIME-Version: 1.0
Content-Type: TEXT/plain; charset=us-ascii
Content-MD5: VBGsWviSukmIqS0vk2qBsg==
X-Mailer: dtmail 1.2.1 CDE Version 1.2.1 SunOS 5.6 sun4u sparc 
X-Mozilla-Status: 8013
X-Mozilla-Status2: 00000000

Dear All on the Galactic Plane Survey Legacy Team,

I just wanted to introduce myself. I am your Legacy liaison scientist for the 
SSC. My main task is to make sure that your program is a success by providing as 
much assistance as I can.
Chip's message indicated that I should be contacted via Ed. On thinking more on 
the subject, I would be happy to take questions directly from anyone (it may 
turn out to be easier to simply take questions from someone working in each of 
the sub-groups you have st up for your project -- but let's see how this goes 
for now).
I shall be looking into Chip's questions over the next couple of days. Hope to 
get back to you soon.
Cheers
Tony

**************************************************
A.P.Marston			Tel: 626-395-3507
Observer Support
SIRTF Science Center, IPAC
Caltech,
Pasadena, CA 91125
**************************************************

From - Fri Jan 19 09:42:45 2001
Received: from astro.wisc.edu (churchwell.astro.wisc.edu [144.92.179.174])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f0IMpPd2228345;
	Thu, 18 Jan 2001 16:51:25 -0600 (CST)
Message-ID: <3A67745A.34A0341D@astro.wisc.edu>
Date: Thu, 18 Jan 2001 16:55:45 -0600
From: Ed Churchwell <ebc@astro.wisc.edu>
X-Mailer: Mozilla 4.75 (Macintosh; U; PPC)
X-Accept-Language: en
MIME-Version: 1.0
To: Tom Megeath <tmegeath@cfa.harvard.edu>,
   churchwell <churchwell@astro.wisc.edu>,
   whitney barbara <bwhitney@colorado.edu>, mathis <mathis@astro.wisc.edu>,
   lazarian <lazarian@astro.wisc.edu>, cassinelli <cassinelli@astro.wisc.edu>,
   chip <chip@astro.wisc.edu>, mwolfire <mwolfire@astro.umd.edu>,
   mwolff wolff <wolff@colorado.edu>, dickey <john@ast1.astro.umn.edu>,
   benjamin <benjamin@wisp5.physics.wisc.edu>, seager <seager@ias.edu>,
   clemens <clemens@protostar.bu.edu>, bania <bania@ninkasi.bu.edu>,
   jackson <jackson@slime.bu.edu>
Subject: Re: IRAC integration times
References: <Pine.GSO.4.05.10101181500160.21670-100000@khumbu.harvard.edu>
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000

Tom,
	Thanks for your note and consideration of the shorter 
integration time.  At 3.6 microns, the confusion limit is about
0.16 mJy.  A 5 sigma detection limit of about 0.25 mJy can 
be reached in about 2 sec at 3.6 and 4.5 microns.  Although
this is above the confusion limit, the 2 sec time would make 
our data much more robust in terms of reduced latent images
and fewer CR hits.
The 0.4 sec high dynamic range option would be useful in crowded
massive star formation complexes which are already known
from radio and MSX data.  Is it an either/or proposition or 
might there be a possibility to have a mixed mode of operation
where we used the high dynamic range option with 2 sec long
exposures in known bright crowded fields and dispensed with
the 0.4 sec option outside these areas?  I should talk
this over with my team before committing us to a specific set
of exposure times.  For my part, I think 4 sec or less would be
optimal.  I will bounce this off my team for their responses.
						Best, Ed

cc Team



Tom Megeath wrote:
> 
> Hi Ed,
> 
> I hope you made if safely back to Madison.
> 
> The IRAC team is starting a re-evaluation of integration times.  I will
> try to keep you posted and ask for input.  I think there is some interest
> in finding a time which will be optimal for your survey (I just worked it
> out: your project will roughly contain 5% of all IRAC time in the first
> 2.5 years), but I can't guarantee anything at the moment.
> 
> I had two questions for the moment.  First, what is the integration time
> at which your measurements become confusion limited.  From our dinner
> conversation, I remember the number 6 seconds - I wanted to confirm this
> number.
> 
> Second, if we went to a shorter integration time, for example 6 seconds,
> would you be willing to give up the high dynamic range mode.  The high
> dynamic range mode would take a 0.4 and 6 second exposure.  In a 6 second
> exposure, you would saturate on sources at 90 mJy - as opposed to around
> 1.4 Jy at 0.4 second.  The problem with the high dynamic range mode with
> short 6 second integrations is that the data rate may be too high, and
> there would be extra overheads for data transfer.
> 
> Best wishes,
> Tom

From - Sat Jan 20 13:50:33 2001
Received: from astro.wisc.edu (churchwell.astro.wisc.edu [144.92.179.174])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f0KJldd2348928;
	Sat, 20 Jan 2001 13:47:39 -0600 (CST)
Message-ID: <3A69EC4E.368EB978@astro.wisc.edu>
Date: Sat, 20 Jan 2001 13:51:46 -0600
From: Ed Churchwell <ebc@astro.wisc.edu>
X-Mailer: Mozilla 4.75 (Macintosh; U; PPC)
X-Accept-Language: en
MIME-Version: 1.0
To: Tom Megeath <tmegeath@cfa.harvard.edu>,
   churchwell <churchwell@astro.wisc.edu>,
   whitney barbara <bwhitney@colorado.edu>, mathis <mathis@astro.wisc.edu>,
   lazarian <lazarian@astro.wisc.edu>, cassinelli <cassinelli@astro.wisc.edu>,
   chip <chip@astro.wisc.edu>, mwolfire <mwolfire@astro.umd.edu>,
   mwolff wolff <wolff@colorado.edu>, dickey <john@ast1.astro.umn.edu>,
   benjamin <benjamin@wisp5.physics.wisc.edu>, seager <seager@ias.edu>,
   clemens <clemens@protostar.bu.edu>, bania <bania@ninkasi.bu.edu>,
   jackson <jackson@slime.bu.edu>
Subject: Re: IRAC integration times
References: <Pine.GSO.4.05.10101191329510.21670-100000@khumbu.harvard.edu>
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000

Dear Tom,
	Thanks for the info on possible minimum integration times
and HDR mode combinations.  I am copying this to my team 
members so they can think about it before our telecon next 
Tuesday.  We will discuss it then and get back to you with our
recommendations next week.  I also want to express my 
appreciation to the IRAC Instrument Team for supporting 
a shorter integration time.  Hopefully this will be beneficial 
for calibration and possibly other users as well.
							Best, Ed 

Tom Megeath wrote:
> 
> Hi Ed,
> 
> The HDR mode for 12 seconds (12, 2 and 0.4 sec) will probably go to one 12
> second frame and one 0.6 second frame.  The problem with the original HDR
> mode (12, 2 and 0.4) is that there is an extra 6-15 second overhead which
> was not accounted for in the SPOT time estimator (unfortunately, the data
> flow - which depends on the interaction of the IRAC camera with the
> spacecraft - was not well understood when the estimator was written).
> 
> What I am suggesting is the following mode:  A 4 second integration at
> each point with one dither.  Thus, you would have two, spatially offset, 4
> second integrations at each point in the sky. The saturation level would
> be 140 Jy.
> 
> An alternative, which would depend on the data compression rate onboard
> the spacecraft (a number which is not known at the moment), would be an
> HDR 4 second mode: a 4 second and an 0.4 second integration.
> 
> In either of these modes, you could cycle 2 times through a map with
> differing offsets.  Thus, at each position in the sky you would have two 4
> second (and with HDR two 0.4 second integration).  Plus, these may be
> separated in time by an hour or so, which may (I have to work this out) be
> enough to detect a small motion in many of the asteroids in your field.
> 
> The downside is that due to the extra moves in this plan, your time
> estimates will probably be about 30% higher.
> 
> I should add that the implementation of these modes depends on what we can
> convince the SSC to support.  I hope that if we come up with a very good,
> detailed reason to support a particular mode, they will adopt it.
> 
> Cheers,
> Tom
> 
> On Thu, 18 Jan 2001, Ed Churchwell wrote:
> 
> > Tom,
> >       Thanks for your note and consideration of the shorter
> > integration time.  At 3.6 microns, the confusion limit is about
> > 0.16 mJy.  A 5 sigma detection limit of about 0.25 mJy can
> > be reached in about 2 sec at 3.6 and 4.5 microns.  Although
> > this is above the confusion limit, the 2 sec time would make
> > our data much more robust in terms of reduced latent images
> > and fewer CR hits.
> > The 0.4 sec high dynamic range option would be useful in crowded
> > massive star formation complexes which are already known
> > from radio and MSX data.  Is it an either/or proposition or
> > might there be a possibility to have a mixed mode of operation
> > where we used the high dynamic range option with 2 sec long
> > exposures in known bright crowded fields and dispensed with
> > the 0.4 sec option outside these areas?  I should talk
> > this over with my team before committing us to a specific set
> > of exposure times.  For my part, I think 4 sec or less would be
> > optimal.  I will bounce this off my team for their responses.
> >                                               Best, Ed
> >
> > cc Team
> >
> >
> >
> > Tom Megeath wrote:
> > >
> > > Hi Ed,
> > >
> > > I hope you made if safely back to Madison.
> > >
> > > The IRAC team is starting a re-evaluation of integration times.  I will
> > > try to keep you posted and ask for input.  I think there is some interest
> > > in finding a time which will be optimal for your survey (I just worked it
> > > out: your project will roughly contain 5% of all IRAC time in the first
> > > 2.5 years), but I can't guarantee anything at the moment.
> > >
> > > I had two questions for the moment.  First, what is the integration time
> > > at which your measurements become confusion limited.  From our dinner
> > > conversation, I remember the number 6 seconds - I wanted to confirm this
> > > number.
> > >
> > > Second, if we went to a shorter integration time, for example 6 seconds,
> > > would you be willing to give up the high dynamic range mode.  The high
> > > dynamic range mode would take a 0.4 and 6 second exposure.  In a 6 second
> > > exposure, you would saturate on sources at 90 mJy - as opposed to around
> > > 1.4 Jy at 0.4 second.  The problem with the high dynamic range mode with
> > > short 6 second integrations is that the data rate may be too high, and
> > > there would be extra overheads for data transfer.
> > >
> > > Best wishes,
> > > Tom
> >

From - Tue Jan 23 15:08:23 2001
Received: from hydra.ipac.caltech.edu (hydra.ipac.caltech.edu [134.4.10.102])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f0NL6Dd2520016;
	Tue, 23 Jan 2001 15:06:13 -0600 (CST)
Received: from sscsci9 (sscsci9.ipac.caltech.edu [134.4.60.71])
	by hydra.ipac.caltech.edu (8.9.3/8.9.3) with SMTP id NAA02838;
	Tue, 23 Jan 2001 13:05:30 -0800 (PST)
Message-Id: <200101232105.NAA02838@hydra.ipac.caltech.edu>
Date: Tue, 23 Jan 2001 13:05:30 -0800 (PST)
From: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Reply-To: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Subject: Re: Telecon Minutes from Jan 23rd
To: tmarston@mail0.ipac.caltech.edu, chip@astro.wisc.edu
Cc: ebc@astro.wisc.edu, churchwell@astro.wisc.edu, bwhitney@colorado.edu,
   mathis@astro.wisc.edu, lazarian@astro.wisc.edu, cassinelli@astro.wisc.edu,
   mwolfire@astro.umd.edu, wolff@colorado.edu, john@ast1.astro.umn.edu,
   benjamin@wisp5.physics.wisc.edu, seager@ias.edu, clemens@protostar.bu.edu,
   bania@ninkasi.bu.edu, jackson@slime.bu.edu, meade@sal.wisc.edu,
   brian@sal.wisc.edu, tmarston@ipac.caltech.edu, watson@astro.wisc.edu
MIME-Version: 1.0
Content-Type: TEXT/plain; charset=us-ascii
Content-MD5: Rp3gF+G8p+AKyY1jlE2y7A==
X-Mailer: dtmail 1.2.1 CDE Version 1.2.1 SunOS 5.6 sun4u sparc 
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000

Dear All,
I have had a word with Bill Reach to try to clarify the proposed new AOR. 
For the situation where you have 2s+0.4s integrations, it appears likely that 
each position will take approx. 18 seconds (NOT an additional 15 seconds to 
transfer data -- slew and data-taking can be done in parallel). Obviously this 
amount doubles if you do 2 dithers at each position.
The hexagonal observing grid can currently be of variable size -- this will be 
driven partly by what Legacy teams would like to have (i.e. you).
I was asked to check on overlap -- a mosaicing program is being created here, 
your originally stated 8% overlap of fields would be fine but you might get away 
with a bit less than this. 
Lastly -- you get early warning on a topic that has arisen at SSC. If we are to 
attempt scheduling then we would need as many AORs from the Legacy projects as 
possible (and GTOs for that matter). If you want an idea of any potential 
scheduling problems it might be good to submit AORs with the target lists in 
April. Let me stress -- this is NOT required of you but is response to concerns 
that both Legacy and GTO folks have regarding how easy it will be to schedule 
the first year of observations. Preliminary estimates are that this should not 
be a big problem but we would like to check it out as earlier as possible. Once 
again, this is not a requirement of you. We might also be able to do something 
if you supplied us with the AOR information some time between April and October.
For this group there is also the concern that the 2secs integration time mode 
does not yet exist (in SPOT). We would suggest that you use the HDR (12 secs) 
mode to produce AORs for such trials. The total time might be over-estimated but 
this way we get a good idea of the problems there might be in scheduling 
(timing, total AOR times and positions of observations are the main issues for 
the scheduling).
Hope this helps.
Cheers
Tony


> Date: Tue, 23 Jan 2001 13:49:53 -0600
> From: Chip Kobulnicky <chip@astro.wisc.edu>
> X-Accept-Language: en
> MIME-Version: 1.0
> To: Tony Marston <tmarston@mail0.ipac.caltech.edu>
> CC: ebc@astro.wisc.edu, churchwell@astro.wisc.edu, bwhitney@colorado.edu, 
mathis@astro.wisc.edu, lazarian@astro.wisc.edu, cassinelli@astro.wisc.edu, 
mwolfire@astro.umd.edu, wolff@colorado.edu, john@ast1.astro.umn.edu, 
benjamin@wisp5.physics.wisc.edu, seager@ias.edu, clemens@protostar.bu.edu, 
bania@ninkasi.bu.edu, jackson@slime.bu.edu, meade@sal.wisc.edu, 
brian@sal.wisc.edu, tmarston@ipac.caltech.edu, watson@astro.wisc.edu
> Subject: Telecon Minutes from Jan 23rd
> Content-Transfer-Encoding: 7bit
> 
> Telecon Minutes of 23 January 2001
> 
> TEAM PRESENT: Churchwell, Kobulnicky, Christer Watson, Meade, Babler,
> Mathis
> TEAM BY TELECON: Seager, Wolff, Clemens, Wolfire, Whitney, Bania, Tony
> Marston
> 
> Ed reviewed notes from Meeting at SSC 12-13 January.
> 
> We will be expeected to produce some software as part of the Legacy
> effort but we don't want to commit to doing too much.  We will work
> with other groups so as to not duplicate effort.
> 
> 
> EPO budget
> 
> We need to think about how to spend EPO money, about $8k/year, perhaps
> we can use it to fund the speakers who will travel around to speak
> about Legacy Science.  Also the Space Place at UW can make great use of
> a little money like this.
> 
> Mark would like a piece of the EPO money to use with Lee Mundy at MD.
> 
> Important Deadlines:
>   March 14: EPO proposal call
>   April 6: revised observing plans due
>      We will have to work to avoid overlap with GTO areas
>      Need a description of fields to be observed
>   May 2:  revised proposals due; we will have to identify the impact of
> 	  budget reductions 
>   May 9: Extended Abstracts due; will be published for the communty
>   May 16: multi-year EPO proposals due
>   Sep 4: observing strategy review at SSC
>   Oct 3: Delivery of AORs  
> 2002
>   Mar:  Data plan review 
>   1/2 year after launch: validation review of observing strategy &
>       progress on post-pipeline progress
>   End of stage 2: delivery of final data products & documents
>       also delivery of software tools
>   
> We have 4 working groups in Phase 1:
>   1) Hardware Acquisition; we need recommendations right away
>   2) Survey planning; 
>   3) Data Analysis
>   4) Web tools
> 
>    In phase 2
> 
>   1)  Post-pipeline processing; (quality asseessment, source extraction)
>   2)  Higher level data analysis; (cross IDs, crowded field
> deconvolution)  
>   3)  Catalog (Mike) & Web Tools (Mark)
> 
> Postdoc Hire: Ed spoke with Gus ?? who might be a good postdoc hire,
> 	a student of Charlie Lada who has experience with IR and large
> databases.
>         A few other names: 
>           ??     A Korean student...
>           James Lloyd: student at Berkely with James Graham,  Tom Bania
> knows
> 		him. 
>           Greg Sloan: Another name from Dan, works with Steve Price on
> MSX
>           Ed will talk to Al Harper & R. Hildebrand to see if they can
> recommend
>           
> ****************
> To do list:
> ****************
> 
>   Hardware definition: should acquire computer by march; need computer 
> 	recommendation ASAP
> 	initial computer configuration by March
> 	 Database configuration by July?
>   Planning: need software to visualize fields and produce AORs by March
>    New SPOT will be released in about 2 weeks; it will include 
> 	ability to visualize AORs
>         spot will not have the new AOT for IRAC at this point
>         Eventually, hexagonal mapping for IRAC is allowed 
> 	  but will not be available in the next SPOT version; 
>           Tony Marston says we CAN be moving during readouts but 15 sec
> readouts
>           still limit our efficiency.   He's unclear whether 18 sec or
> 	  maybe 33 sec will be the minimum downlink time for a given
> 	  field.  With 0.4 and 2 sec integration times, but no 12 sec frame, we
> 	  will save saturation.  Chip will work to estimate saturation
> 	  incidence per field.
>           
>   Software: data analysis tools to be in place by April, 2002
>   Web Tools: we may not need to develop web portal tool for access to
> data
>       since SSC will develop something like this for the archive, we
> hope
>   
> Tony will look into someone we can work with at SSC involving archive
> interface.
> 
> Ed will talk to Hildebrand and Harper about postdoc possibilities
> 
> Mike will report on computer purchase next time.
> 
> *********************
> Upcomming events
> *********************
> All-Team Meeting: Friday-Sat, 2-3 Feb in Madison.  Watch your email for
> details   
>        
> Agenda items for Feb meeting
>    1) Observing Strategy; how many dithers; how will we deal with Cosmic
> rays?
> 	    Saturation?
>    2) What common software should can develop with other teams?
>       We need to trace the software flow through every step from BCD to
> final
> 	products
>    3)  Team name/logo & summary of project for release to the community
> 
> NEXT TELECON: Tuesday, Feb 13th, 11:00 a.m. Central time.

**************************************************
A.P.Marston			Tel: 626-395-3507
Observer Support
SIRTF Science Center, IPAC
Caltech,
Pasadena, CA 91125
**************************************************

From - Wed Jan 24 15:57:49 2001
Received: from hydra.ipac.caltech.edu (hydra.ipac.caltech.edu [134.4.10.102])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f0OLs3d2602451;
	Wed, 24 Jan 2001 15:54:03 -0600 (CST)
Received: from shiraz.ipac.calteche.du (shiraz.ipac.caltech.edu [134.4.60.155])
	by hydra.ipac.caltech.edu (8.9.3/8.9.3) with SMTP id NAA13801;
	Wed, 24 Jan 2001 13:53:54 -0800 (PST)
Message-Id: <200101242153.NAA13801@hydra.ipac.caltech.edu>
X-Sender: mdb@pop.ipac.caltech.edu
X-Mailer: QUALCOMM Windows Eudora Pro Version 4.0.2 
Date: Wed, 24 Jan 2001 13:51:40 -0800
To: mdb@ipac.caltech.edu
From: Michael Bicay <mdb@ipac.caltech.edu>
Subject: LegSci Workshop Report
Mime-Version: 1.0
Content-Type: multipart/alternative;
	types="text/plain,text/html";
	boundary="=====================_4754615==_.ALT"
X-Mozilla-Status: 8001
X-Mozilla-Status2: 00000000

--=====================_4754615==_.ALT
Content-Type: text/plain; charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable


SIRTF Legacy Science Workshop
DRAFT Report


The SIRTF Science Center (SSC) hosted a Legacy Science Workshop on Friday=
 and
Saturday, 2001 January 12-13 in the Morrisroe Astrosciences building on the
Caltech campus in Pasadena.  The Workshop brought together, for the first
time,
the Legacy Science Principal Investigators (PIs), the SIRTF Instrument Team
(IT) Principal Investigators, and SSC science and technical staff.  The
purpose
of the Workshop was to initiate long-term relationships between the LegSci
PIs,
the ITs and the SSC, with the goal of facilitating mutual exchanges of=
 useful
information.

The Friday morning executive session involved the six LegSci PIs, four=
 members
from the SSC (Soifer, Helou, Green, Bicay), Project Scientist Werner and
Project Manager Gallagher (both from JPL), and the NASA-HQ Program Scientist
(Harley Thronson).  Bicay welcomed the attendees in his opening remarks,
outlined the goals of the Workshop, and summarized what the SSC wanted to=
 see
come out of Saturday=92s breakout sessions.  Thronson offered the HQ=
 perspective
on the LegSci Program and its potential impact on future NASA missions.

Soifer=92s presentation concentrated on the expectations inherent in the=
 LegSci
Program, and on the roles and responsibilities of the LegSci teams (LSTs),=
 the
SSC, and the ITs.  Helou led a discussion pertaining to communications and
interactions, which include the LegSci Liaison Scientists, the LegSci=
 Working
Group, Interest Groups (to evolve from this Workshop), and the ITs.  He also
discussed reports and reviews, and data product deliveries.  Bicay then
discussed the LegSci schedules, with emphasis on the Stage One milestones in
the coming year.  He also closed with a short presentation on the=
 contractual
aspects of the LegSci Program.

Friday afternoon was devoted to a series of ~half-hour presentations by
each of
the LegSci PIs.  They were asked by the SSC to provide a science summary of
their project, and to also introduce the databases and post-pipeline data
products and/or analysis tools to be developed through their project.  The=
 PIs
were also asked to present their perspective on the biggest challenge(s)
facing
the successful completion of their project.

Two of the projects have established Web sites, which will soon be linked=
 into
the SIRTF site.

Dickinson:    =20
<http://www.stsci.edu/science/goods/>http://www.stsci.edu/science/goods/
Kennicutt:    =20
<http://ircamera.as.arizona.edu/legacy/>http://ircamera.as.arizona.edu/legac=
y/

The other projects were encouraged to inform the SSC if/when they produce
online sites also.

Brief descriptions of the science goals of each LegSci projects are=
 available
on the SIRTF public Web site.  More detailed descriptions (~5-page =93extend=
ed
abstracts=94) will be available soon.

This report hereby summarizes the major concerns of each LegSci PI.

Dickinson:
(1)     Data processing requirements will push the calibration limits early=
 in
the SIRTF mission.
(2)     Scheduling of the IRAC Deep Survey will require repeated coverage=
 six
months later, with a 180-degree flip in field orientation.

Lonsdale:
(1)     Unlike the original proposal, which had no constraints on instrument
usage, the project recommended by the Time Allocation Committee would=
 increase
the areal overlap between the IRAC and MIPS surveys.  This, in turn, places
increased demands on scheduling and orientation of fields.

Kennicutt:
(1)     Schedule flexibility =20
(a)     Matching orientation of MIPS/SED strips=20
(b)     Second-look spectroscopy of IR-selected targets=20
(2)     Data reduction =20
(a)     Project utilizes all SIRTF instruments in all observing modes=20
(b)     Shared data reduction software is deemed to be desirable=20
(3)     Variable Point Spread Function as a function of wavelength =20
(a)     Matched-resolution SEDs from images=20
(b)     Calibrated emission-line spectrophotometry.

Churchwell:
(1)     IRAC saturation and latency effects

Evans:
(1)     Achieving goals on 60% of requested funding level
(2)     Preparing for data reduction with severely constrained funding in
Stage
One
(3)     Interfacing with SSC, ITs and other LSTs
(4)     Responding to changes in instrument performance and in SIRTF=
 schedules

Meyer:
(1)     Coordination with SSC =20
(a)     Status of pipelines=20
(b)     Effort towards calibration=20
(2)     Coordination with ITs =20
(a)     Adopt common observational procedures?=20
(b)     How to work around GTO proprietary periods=20
(3)     Coordination with other LSTs =20
(a)     Undertake joint software development projects?

Saturday morning was devoted to five breakout sessions, organized by
instrument
and sky coverage.  Each session involved participants from the LSTs, the ITs
and the SSC.  The goals of these 90-minute sessions were to: =20
(1)     Identify issues and topics of common interest =20
=B7       Observing strategies, data processing, data products, etc.=20
(2)     Prioritize issues/topics =20
=B7       Schedules for working the issues and solving problems=20
(3)     Identify direct or implied assumptions =20
=B7       SSC resources and/or commitments=20
(4)     Develop ideas for organizing and sustaining Interest Groups (IGs) =
=20
=B7       Processes, leads, coordination, communication=20
=B7       Interfaces with LegSci Working Group

This turned out to be an overly ambitious set of goals, and most of the
session
discussions concentrated on Item (1) above.

Reports from each of the breakout sessions were presented early Saturday
afternoon, and are summarized here.

IRAC Wide-Area (Bill Reach, Session Chair)
This session recommended the creation of IGs to study four broad topics.

(1)     Scheduling & Observing Strategies =20
=B7       Possible short integration time frame (2 sec)=20
=B7       Possible dither table changes & re-observing needs=20
=B7       Hexagonal mapping area to make observations more robust to=
 scheduling=20
(2)     IRAC Calibration =20
=B7       Stability of flats/darks=20
=B7       Gain variations over 3+ hour periods after bright-source viewing=
=20
=B7       Use of =93Fixsen-style=94 flat fields=20
=B7       Calibration stars: which ones other than those selected by IRAC=
 team=20
=B7       Latency predictability/time scales=20
(3)     IRAC Tools =20
=B7       Software for mosaicing from SSC.  Beta testing by LSTs?=20
=B7       Pipeline issues: only documentation?=20
(4)     LegSci Data Products =20
=B7       Data access for all final products provided by SSC (via IRSA)=20
=B7       Possible coordination between teams of data products=20
=B7       Community access to products

IRAC Wide-Area (John Stauffer, Session Chair)
Recommended Interest Groups:
(1)     Pipeline  =20
=B7       Basic Calibrated Data (BCD) & Extended Pipeline=20
(2)     Source Extraction
(3)     LegSci Product Dissemination =20
=B7       Standards=20
(4)     Super-Calibration =20
=B7       Fixsen, e.g.=20
(5)     Flux Calibration & Calibration Observing Strategy
(6)     Debris Disk Science
(7)     Cloud Core/Cluster Science

In addition, this session identified other issues pertinent to all SIRTF
groups.
(A)     BCD Pipeline Pliability =20
=B7       How to modify/interact with =93guts=94 of BCD pipelines=20
(B)     Definition of Extended Pipeline & Connection to Tool Development
(C)     Commonality of Product Definition/Formats for LegSci Products
(D)     Need for Documentation/Information =20
=B7       Pipelines, In-Orbit Checkout, Calibration

IRS Targeted (Tom Soifer, Session Chair)
This session recommended the creation of one functional Interest Group and=
 one
topical science IG.
(1)     IRS Analysis Tool Kit =20
=B7       IDL-based=20
=B7       Built for =93small=94 groups of users: IRS team, Evans, Meyer,=
 Kennicutt,
SSC=20
=B7       Develop tools, based on interest=20
=B7       Set standards=20
=B7       Recommended Lead: Bernhard Brandl (Cornell U.)=20
(2)     Coherent Database for Study of Material in Disks =20
=B7       Coordinate target lists=20
=B7       Observing modes=20
=B7       Possible members =20
=B7       Blake (for Evans)=20
=B7       Meyer (for Meyer)=20
=B7       Watson (for IRS Team)=20
=B7       Jura (for general GTOs)=20
The session also noted these IRS issues of interest:
(A)     Observing Strategies
(B)     Peak-up Imaging

MIPS Wide-Area (Bill Latter, Session Chair)
This session recommended four Interest Groups:
(1)     MIPS Calibration =20
=B7       Ge:Ga calibration (initially, an information route)=20
=B7       Large-field internal calibration=20
(2)     Pipeline Validation by LSTs =20
=B7       Release of pipeline test data=20
(3)     Source Cross-ID/Associations
(4)     Engineering of Infrastructure

The following issues were identified during this session:
(A)     Scan AOR-to-AOR Offsets
(B)     Clarification of 24-micron and Ge:Ga Differences
(C)     Observing Strategy =20
=B7       Need for Total Power Mode=20
(D)     Ge:Ga Spatial Filtering =20
=B7       Are 2 data products needed?=20
(E)     Tools and Standards
(F)           PSF & STinyTim
(G)     Availability of Detailed Information to LSTs =20
=B7       Instrument SDDs=20
=B7       Access to STARS web site at JPL?=20
=B7       Limited LST access to MIPS test data Web site?=20
=B7       Capture of generally useful information=20
(H)     LegSci & Calibration Working Group Linkages

MIPS Targeted (George Helou, Session Chair)
This session identified three Interest Groups:
(1)     Extended/Diffuse Emission =20
=B7       Largely neglected issue by MIPS team; pushed =93downstream=94 by=
 SSC=20
=B7       Bright extended sources involve memory/latency pipeline treatment=
=20
(2)     Super-Resolution
=B7       Separated from image-combination group
=B7       LSTs can contribute to efforts at Arizona
(3)     Asteroid ID Strategies (Data Product Reliability)
=B7       Templates
=B7       Frequencies

The session also identified these issues, some of which pertain to other
groups/instruments and some of which pertain to general communications:
(A)     Data Quality & Documentation
(B)     Databases
(C)     MIPS Data Reduction/Analysis Software
(D)     Calibration/Memory Effects/Latency


Following brief reports from each of the breakout session chairs, a plenary
discussion period ensued.  This exchange of ideas was stimulating, but=
 failed
to produce a consensus on the best way to organize and sustain Interest
Groups.  Nonetheless, some progress was made.  While a couple of the=
 sessions
recommended science-based Interest Groups, it is likely that such groups=
 will
form naturally  with or without the supreme organizational skills of the=
 SSC!=20
Following the Workshop, the SSC management elected to concentrate on forming
function-based IGs and to assume that the topical science groups will form
themselves.

Apart from these science groups, the five breakout sessions recommended the
creation of 17 Interest Groups (excluding any degeneracies).  Given the fact
that LST investigators, IT members and SSC scientists will likely need to
focus
on many functional issues, this number is clearly too many to sustain (to=
 say
nothing of the number of teleconferences that would have to be covered).=20
Therefore, the attendees concurred on the suggestion that a =93small=94=
 number of
IGs be formed, and that each IG would likely want to establish smaller
sub-groups to work detailed and specific issues.

Two primary organizational schemes were debated at length.  In one, there
would
be 4-7 IGS, organized without respect to instruments, per se: (1) Imaging
Tools, (2) Spectroscopic Tools, (3) Data Products, and (4) Pipelines.  There
was some interest in splitting the Pipeline Group into three Groups, one for
each science instrument.  The other scheme would organize the Groups=
 primarily
by instrument: (1) IRAC Pipeline & Tools, (2) IRS Pipelines & Tools, (3)=
 MIPS
Pipelines & Tools, and (4) Post-Pipeline Data Products.  In each of these
schemes, it was assumed that the Pipelines Groups would also include issues
pertaining to calibration and validation.  Moreover, it was assumed that the
Data Products Groups would also include formats, standards, and simulations.=
=20
There was even a suggestion to start with the first scheme and then=
 gradually
transition to the second.

A spirited debate failed to achieve consensus on which approach to=
 implement,
although there was some preference for the second scheme.  The SSC promised=
 to
map all of the various recommendations and issues that emerged from the
breakout sessions into the two schemes, and to recommend which approach to
undertake.  This will be done in a conference call with the LST PIs and the
Instrument Team PIs about two weeks after the Workshop.  [The conference=
 call
has since been scheduled for Monday, January 29 at 1.00pm PST.]


Report filed by M. D. Bicay.

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
Michael D. Bicay (SIRTF Science Center/IPAC)
--------------------------------------------
California Institute of Technology
IPAC 100-22
770 South Wilson Avenue
Pasadena, CA   91125
PHONE: 626.397.9506   FAX: 626.397.7181
--------------------------------------------
mdb@ipac.caltech.edu
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D

--=====================_4754615==_.ALT
Content-Type: text/html; charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<html>
<b><div align=3D"center">
SIRTF Legacy Science Workshop<br>
<font face=3D"Arial, Helvetica">DRAFT Report<br>
<br>
<br>
</font></b></div>
The SIRTF Science Center (SSC) hosted a Legacy Science Workshop on Friday
and Saturday, 2001 January 12-13 in the Morrisroe Astrosciences building
on the Caltech campus in Pasadena.&nbsp; The Workshop brought together,
for the first time, the Legacy Science Principal Investigators (PIs), the
SIRTF Instrument Team (IT) Principal Investigators, and SSC science and
technical staff.&nbsp; The purpose of the Workshop was to initiate
long-term relationships between the LegSci PIs, the ITs and the SSC, with
the goal of facilitating mutual exchanges of useful information.<br>
<br>
The Friday morning executive session involved the six LegSci PIs, four
members from the SSC (Soifer, Helou, Green, Bicay), Project Scientist
Werner and Project Manager Gallagher (both from JPL), and the NASA-HQ
Program Scientist (Harley Thronson).&nbsp; Bicay welcomed the attendees
in his opening remarks, outlined the goals of the Workshop, and
summarized what the SSC wanted to see come out of Saturday=92s breakout
sessions.&nbsp; Thronson offered the HQ perspective on the LegSci Program
and its potential impact on future NASA missions.<br>
<br>
Soifer=92s presentation concentrated on the expectations inherent in the
LegSci Program, and on the roles and responsibilities of the LegSci teams
(LSTs), the SSC, and the ITs.&nbsp; Helou led a discussion pertaining to
communications and interactions, which include the LegSci Liaison
Scientists, the LegSci Working Group, Interest Groups (to evolve from
this Workshop), and the ITs.&nbsp; He also discussed reports and reviews,
and data product deliveries.&nbsp; Bicay then discussed the LegSci
schedules, with emphasis on the Stage One milestones in the coming
year.&nbsp; He also closed with a short presentation on the contractual
aspects of the LegSci Program.<br>
<br>
Friday afternoon was devoted to a series of ~half-hour presentations by
each of the LegSci PIs.&nbsp; They were asked by the SSC to provide a
science summary of their project, and to also introduce the databases and
post-pipeline data products and/or analysis tools to be developed through
their project.&nbsp; The PIs were also asked to present their perspective
on the biggest challenge(s) facing the successful completion of their
project.<br>
<br>
Two of the projects have established Web sites, which will soon be linked
into the SIRTF site.<br>
<br>
Dickinson:<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><a=
 href=3D"http://www.stsci.edu/science/goods/"><font=
 color=3D"#0000FF">http://www.stsci.edu/science/goods/<br>
</a></font><font=
 color=3D"#000000">Kennicutt:<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-=
tab></font><a href=3D"http://ircamera.as.arizona.edu/legacy/"><font=
 color=3D"#0000FF">http://ircamera.as.arizona.edu/legacy/<br>
<br>
</a></font><font color=3D"#000000">The other projects were encouraged to
inform the SSC if/when they produce online sites also.<br>
<br>
Brief descriptions of the science goals of each LegSci projects are
available on the SIRTF public Web site.&nbsp; More detailed descriptions
(~5-page =93extended abstracts=94) will be available soon.<br>
<br>
This report hereby summarizes the major concerns of each LegSci PI.<br>
<br>
Dickinson:<br>
</font><font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nb=
sp;&nbsp;</x-tab></font>Data
processing requirements will push the calibration limits early in the
SIRTF mission.<br>
<font face=3D"Times New Roman, Times">(2)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Scheduling
of the IRAC Deep Survey will require repeated coverage six months later,
with a 180-degree flip in field orientation.<br>
<br>
Lonsdale:<br>
<font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Unlike
the original proposal, which had no constraints on instrument usage, the
project recommended by the Time Allocation Committee would increase the
areal overlap between the IRAC and MIPS surveys.&nbsp; This, in turn,
places increased demands on scheduling and orientation of fields.<br>
<br>
Kennicutt:<br>
<font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Schedule
flexibility<font face=3D"Times New Roman, Times">
<dl>
<dd>(a)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Matching
orientation of MIPS/SED strips<font face=3D"Times New Roman, Times">
<dd>(b)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Second-look
spectroscopy of IR-selected targets<font face=3D"Times New Roman, Times">
</dl>(2)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Data
reduction<font face=3D"Times New Roman, Times">
<dl>
<dd>(a)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Project
utilizes all SIRTF instruments in all observing
modes<font face=3D"Times New Roman, Times">
<dd>(b)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Shared data
reduction software is deemed to be
desirable<font face=3D"Times New Roman, Times">
</dl>(3)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Variable
Point Spread Function as a function of
wavelength<font face=3D"Times New Roman, Times">
<dl>
<dd>(a)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Matched-resolutio=
n
SEDs from images<font face=3D"Times New Roman, Times">
<dd>(b)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Calibrated
emission-line spectrophotometry.<br>
<br>

</dl>Churchwell:<br>
<font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>IRAC
saturation and latency effects<br>
<br>
Evans:<br>
<font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Achieving
goals on 60% of requested funding level<br>
<font face=3D"Times New Roman, Times">(2)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Preparing
for data reduction with severely constrained funding in Stage One<br>
<font face=3D"Times New Roman, Times">(3)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Interfacing
with SSC, ITs and other LSTs<br>
<font face=3D"Times New Roman, Times">(4)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Responding
to changes in instrument performance and in SIRTF schedules<br>
<br>
Meyer:<br>
<font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Coordination
with SSC<font face=3D"Times New Roman, Times">
<dl>
<dd>(a)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Status of
pipelines<font face=3D"Times New Roman, Times">
<dd>(b)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Effort towards
calibration<font face=3D"Times New Roman, Times">
</dl>(2)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Coordination
with ITs<font face=3D"Times New Roman, Times">
<dl>
<dd>(a)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Adopt common
observational procedures?<font face=3D"Times New Roman, Times">
<dd>(b)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>How to work
around GTO proprietary periods<font face=3D"Times New Roman, Times">
</dl>(3)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Coordination
with other LSTs<font face=3D"Times New Roman, Times">
<dl>
<dd>(a)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Undertake
joint software development projects?<br>
<br>

</dl>Saturday morning was devoted to five breakout sessions, organized by
instrument and sky coverage.&nbsp; Each session involved participants
from the LSTs, the ITs and the SSC.&nbsp; The goals of these 90-minute
sessions were to:<font face=3D"Times New Roman, Times">
<dl>
<dd>(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Identify
issues and topics of common interest<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Obser=
ving
strategies, data processing, data products,
etc.<font face=3D"Times New Roman, Times">
</dl>
<dd>(2)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Prioritize
issues/topics<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Sched=
ules
for working the issues and solving
problems<font face=3D"Times New Roman, Times">
</dl>
<dd>(3)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Identify
direct or implied assumptions<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>SSC
resources and/or commitments<font face=3D"Times New Roman, Times">
</dl>
<dd>(4)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Develop ideas
for organizing and sustaining Interest Groups (IGs)<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Proce=
sses,
leads, coordination, communication<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Inter=
faces
with LegSci Working Group<br>
<br>

</dl>
</dl>This turned out to be an overly ambitious set of goals, and most of
the session discussions concentrated on Item (1) above.<br>
<br>
Reports from each of the breakout sessions were presented early Saturday
afternoon, and are summarized here.<br>
<br>
<b><u>IRAC Wide-Area (Bill Reach, Session Chair)<br>
</b></u>This session recommended the creation of IGs to study four broad
topics.<br>
<br>
<font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Scheduling
&amp; Observing Strategies<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Possi=
ble
short integration time frame (2 sec)<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Possi=
ble
dither table changes &amp; re-observing needs<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Hexag=
onal
mapping area to make observations more robust to
scheduling<font face=3D"Times New Roman, Times">
</dl>(2)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>IRAC
Calibration<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Stabi=
lity
of flats/darks<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Gain
variations over 3+ hour periods after bright-source
viewing<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Use
of =93Fixsen-style=94 flat fields<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Calib=
ration
stars: which ones other than those selected by IRAC
team<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Laten=
cy
predictability/time scales<font face=3D"Times New Roman, Times">
</dl>(3)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>IRAC
Tools<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Softw=
are
for mosaicing from SSC.&nbsp; Beta testing by LSTs?<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Pipel=
ine
issues: only documentation?<font face=3D"Times New Roman, Times">
</dl>(4)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>LegSci Data
Products<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Data
access for all final products provided by SSC (via
IRSA)<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Possi=
ble
coordination between teams of data products<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Commu=
nity
access to products<br>
<br>
<b><u>
</dl>IRAC Wide-Area (John Stauffer, Session Chair)<br>
</b></u>Recommended Interest Groups:<br>
<font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Pipeline
<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Basic
Calibrated Data (BCD) &amp; Extended
Pipeline<font face=3D"Times New Roman, Times">
</dl>(2)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Source
Extraction<br>
<font face=3D"Times New Roman, Times">(3)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>LegSci
Product Dissemination<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Stand=
ards<font face=3D"Times New Roman, Times">
</dl>(4)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Super-Calibratio=
n<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Fixse=
n,
e.g.<font face=3D"Times New Roman, Times">
</dl>(5)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Flux
Calibration &amp; Calibration Observing Strategy<br>
<font face=3D"Times New Roman, Times">(6)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Debris
Disk Science<br>
<font face=3D"Times New Roman, Times">(7)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Cloud
Core/Cluster Science<br>
<br>
In addition, this session identified other issues pertinent to all SIRTF
groups.<br>
<font face=3D"Times New Roman, Times">(A)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>BCD
Pipeline Pliability<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>How
to modify/interact with =93guts=94 of BCD
pipelines<font face=3D"Times New Roman, Times">
</dl>(B)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Definition of
Extended Pipeline &amp; Connection to Tool Development<br>
<font face=3D"Times New Roman, Times">(C)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Commonality
of Product Definition/Formats for LegSci Products<br>
<font face=3D"Times New Roman, Times">(D)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Need
for Documentation/Information<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Pipel=
ines,
In-Orbit Checkout, Calibration<br>
<br>
<b><u>
</dl>IRS Targeted (Tom Soifer, Session Chair)<br>
</b></u>This session recommended the creation of one functional Interest
Group and one topical science IG.<br>
<font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>IRS
Analysis Tool Kit<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>IDL-b=
ased<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Built
for =93small=94 groups of users: IRS team, Evans, Meyer, Kennicutt,
SSC<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Devel=
op
tools, based on interest<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Set
standards<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Recom=
mended
Lead: Bernhard Brandl (Cornell U.)<font face=3D"Times New Roman, Times">
</dl>(2)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Coherent
Database for Study of Material in Disks<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Coord=
inate
target lists<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Obser=
ving
modes<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Possi=
ble
members<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Blake
(for Evans)<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Meyer
(for Meyer)<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Watso=
n
(for IRS Team)<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Jura
(for general GTOs)
</dl>
</dl>The session also noted these IRS issues of interest:<br>
<font face=3D"Times New Roman, Times">(A)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Observing
Strategies<br>
<font face=3D"Times New Roman, Times">(B)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Peak-up
Imaging<br>
<br>
<b><u>MIPS Wide-Area (Bill Latter, Session Chair)<br>
</b></u>This session recommended four Interest Groups:<br>
<font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>MIPS
Calibration<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Ge:Ga
calibration (initially, an information route)<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Large=
-field
internal calibration<font face=3D"Times New Roman, Times">
</dl>(2)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Pipeline
Validation by LSTs<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Relea=
se
of pipeline test data<font face=3D"Times New Roman, Times">
</dl>(3)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Source
Cross-ID/Associations<br>
<font face=3D"Times New Roman, Times">(4)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Engineering
of Infrastructure<br>
<br>
The following issues were identified during this session:<br>
<font face=3D"Times New Roman, Times">(A)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Scan
AOR-to-AOR Offsets<br>
<font face=3D"Times New Roman, Times">(B)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Clarification
of 24-micron and Ge:Ga Differences<br>
<font face=3D"Times New Roman, Times">(C)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Observing
Strategy<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Need
for Total Power Mode<font face=3D"Times New Roman, Times">
</dl>(D)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Ge:Ga Spatial
Filtering<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Are
2 data products needed?<font face=3D"Times New Roman, Times">
</dl>(E)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Tools and
Standards<br>
<font face=3D"Times New Roman, Times">(F)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
</font>PSF &amp; STinyTim<br>
<font face=3D"Times New Roman, Times">(G)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Availability
of Detailed Information to LSTs<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Instr=
ument
SDDs<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Acces=
s
to STARS web site at JPL?<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Limit=
ed
LST access to MIPS test data Web site?<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Captu=
re
of generally useful information<font face=3D"Times New Roman, Times">
</dl>(H)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>LegSci &amp;
Calibration Working Group Linkages<br>
<br>
<b><u>MIPS Targeted (George Helou, Session Chair)<br>
</b></u>This session identified three Interest Groups:<br>
<font face=3D"Times New Roman, Times">(1)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Extended/Diffuse
Emission<font face=3D"Symbol">
<dl>
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Large=
ly
neglected issue by MIPS team; pushed =93downstream=94 by
SSC<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Brigh=
t
extended sources involve memory/latency pipeline
treatment<font face=3D"Times New Roman, Times">
</dl>(2)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Super-Resolution=
<br>
<font face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</=
x-tab></font>Separated
from image-combination group<br>
<font face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</=
x-tab></font>LSTs
can contribute to efforts at Arizona<br>
<font face=3D"Times New Roman, Times">(3)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Asteroid
ID Strategies (Data Product Reliability)<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Templates<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Frequencies<br>
<br>
The session also identified these issues, some of which pertain to other
groups/instruments and some of which pertain to general
communications:<br>
<font face=3D"Times New Roman, Times">(A)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Data
Quality &amp; Documentation<br>
<font face=3D"Times New Roman,=
 Times">(B)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Databases<br>
<font face=3D"Times New Roman, Times">(C)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>MIPS
Data Reduction/Analysis Software<br>
<font face=3D"Times New Roman, Times">(D)<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Calibration/Memory
Effects/Latency<br>
<br>
<br>
Following brief reports from each of the breakout session chairs, a
plenary discussion period ensued.&nbsp; This exchange of ideas was
stimulating, but failed to produce a consensus on the best way to
organize and sustain Interest Groups.&nbsp; Nonetheless, some progress
was made.&nbsp; While a couple of the sessions recommended science-based
Interest Groups, it is likely that such groups will form naturally&nbsp;
with or without the supreme organizational skills of the SSC!&nbsp;
Following the Workshop, the SSC management elected to concentrate on
forming function-based IGs and to assume that the topical science groups
will form themselves.<br>
<br>
Apart from these science groups, the five breakout sessions recommended
the creation of 17 Interest Groups (excluding any degeneracies).&nbsp;
Given the fact that LST investigators, IT members and SSC scientists will
likely need to focus on many functional issues, this number is clearly
too many to sustain (to say nothing of the number of teleconferences that
would have to be covered).&nbsp; Therefore, the attendees concurred on
the suggestion that a =93small=94 number of IGs be formed, and that each IG
would likely want to establish smaller sub-groups to work detailed and
specific issues.<br>
<br>
Two primary organizational schemes were debated at length.&nbsp; In one,
there would be 4-7 IGS, organized without respect to instruments, per se:
(1) Imaging Tools, (2) Spectroscopic Tools, (3) Data Products, and (4)
Pipelines.&nbsp; There was some interest in splitting the Pipeline Group
into three Groups, one for each science instrument.&nbsp; The other
scheme would organize the Groups primarily by instrument: (1) IRAC
Pipeline &amp; Tools, (2) IRS Pipelines &amp; Tools, (3) MIPS Pipelines
&amp; Tools, and (4) Post-Pipeline Data Products.&nbsp; In each of these
schemes, it was assumed that the Pipelines Groups would also include
issues pertaining to calibration and validation.&nbsp; Moreover, it was
assumed that the Data Products Groups would also include formats,
standards, and simulations.&nbsp; There was even a suggestion to start
with the first scheme and then gradually transition to the second.<br>
<br>
A spirited debate failed to achieve consensus on which approach to
implement, although there was some preference for the second
scheme.&nbsp; The SSC promised to map all of the various recommendations
and issues that emerged from the breakout sessions into the two schemes,
and to recommend which approach to undertake.&nbsp; This will be done in
a conference call with the LST PIs and the Instrument Team PIs about two
weeks after the Workshop.&nbsp; [The conference call has since been
scheduled for Monday, January 29 at 1.00pm PST.]<br>
<br>
<br>
Report filed by M. D. Bicay.<br>
<br>
<div>=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D</div>
<div>Michael D. Bicay (SIRTF Science Center/IPAC)</div>
<div>--------------------------------------------</div>
<div>California Institute of Technology</div>
<div>IPAC 100-22</div>
<div>770 South Wilson Avenue</div>
<div>Pasadena, CA&nbsp;&nbsp; 91125</div>
<div>PHONE: 626.397.9506&nbsp;&nbsp; FAX: 626.397.7181</div>
<div>--------------------------------------------</div>
<div>mdb@ipac.caltech.edu</div>
<div>=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D</div>
</html>

--=====================_4754615==_.ALT--

From - Sat Jan 27 10:12:56 2001
Received: from astro.wisc.edu (churchwell.astro.wisc.edu [144.92.179.174])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f0QGtgd2708770;
	Fri, 26 Jan 2001 10:55:42 -0600 (CST)
Message-ID: <3A71AD0B.3213615@astro.wisc.edu>
Date: Fri, 26 Jan 2001 10:59:59 -0600
From: Ed Churchwell <ebc@astro.wisc.edu>
X-Mailer: Mozilla 4.75 (Macintosh; U; PPC)
X-Accept-Language: en
MIME-Version: 1.0
To: churchwell <churchwell@astro.wisc.edu>,
   whitney barbara <bwhitney@colorado.edu>, mathis <mathis@astro.wisc.edu>,
   lazarian <lazarian@astro.wisc.edu>, cassinelli <cassinelli@astro.wisc.edu>,
   chip <chip@astro.wisc.edu>, mwolfire <mwolfire@astro.umd.edu>,
   mwolff wolff <wolff@colorado.edu>, dickey <john@ast1.astro.umn.edu>,
   benjamin <benjamin@wisp5.physics.wisc.edu>, seager <seager@ias.edu>,
   clemens <clemens@protostar.bu.edu>, bania <bania@ninkasi.bu.edu>,
   jackson <jackson@slime.bu.edu>, meade <meade@sal.wisc.edu>,
   babler <brian@sal.wisc.edu>, marston <tmarston@ipac.caltech.edu>
Subject: [Fwd: archiving etc]
Content-Type: multipart/mixed;
 boundary="------------B02C549C7125E9A96B467290"
X-Mozilla-Status: 8001
X-Mozilla-Status2: 00000000

This is a multi-part message in MIME format.
--------------B02C549C7125E9A96B467290
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit

Team,
	This message from Carol Lonsdale indicates that our 
hesitation about cross correlation of SIRTF sources with 
other catalogs may not be as problematic as we had thought.
I have told her that we will be interested in learning more
about the IRSA options for correlation of our catalogs with
those in the IRSA archive.
							Ed
--------------B02C549C7125E9A96B467290
Content-Type: message/rfc822
Content-Transfer-Encoding: 7bit
Content-Disposition: inline

Received: from madraf.astro.wisc.edu (madraf.astro.wisc.edu [144.92.179.156])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with SMTP id f0PMwxd2644197
	for <ebc@uwast.astro.wisc.edu>; Thu, 25 Jan 2001 16:58:59 -0600 (CST)
Resent-Message-Id: <200101252258.f0PMwxd2644197@uwast.astro.wisc.edu>
Resent-Date: Thu, 25 Jan 2001 16:56:09 EST
Resent-From: <churchwell@madraf.astro.wisc.edu>
Resent-To: <ebc@uwast.astro.wisc.edu>
Received: from hydra.ipac.caltech.edu by madraf.astro.wisc.edu (MX V4.1 VAX)
          with SMTP; Thu, 25 Jan 2001 16:56:08 EST
Received: from chaplin.ipac.caltech.edu (chaplin.ipac.caltech.edu
          [134.4.50.77]) by hydra.ipac.caltech.edu (8.9.3/8.9.3) with ESMTP id
          OAA25196; Thu, 25 Jan 2001 14:58:38 -0800 (PST)
From: cjl@ipac.caltech.edu
Received: (from cjl@localhost) by chaplin.ipac.caltech.edu (8.9.3/8.9.3) id
          OAA18509; Thu, 25 Jan 2001 14:58:37 -0800 (PST)
Message-ID: <200101252258.OAA18509@chaplin.ipac.caltech.edu>
Subject: archiving etc
To: nje@bubba.as.utexas.edu (Neal Evans)
Date: Thu, 25 Jan 2001 14:58:37 -0800 (PST)
CC: churchwell@madraf.astro.wisc.edu, cjl@ipac.caltech.edu, med@stsci.edu,
   mmeyer@as.arizona.edu, rkennicutt@as.arizona.edu
In-Reply-To: <200101252125.PAA03227@bubba.as.utexas.edu> from "Neal Evans" at
    Jan 25, 2001 03:25:37 PM
X-Mailer: ELM [version 2.5 PL2]
MIME-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit

Dear Colleagues,

Input for the draft Neal sent around to follow.  Meanwhile here's some
notes about archiving, data distribution, catalog cross-correlations, etc.
that you mind find useful, and give you some background on how IRSA at IPAC 
can help all SIRTF projects, and can most likely reduce the costs you've 
estimated for this activity.

I am Project Scientist for the IPAC Archive, IRSA (InfraRed Science Archive -
catchy name, huh?).  IRSA has one of the most Virtual Observatory (VO)-like 
archives in the astronomical community.  It was designed in response to the
expected needs of 2MASS: fast, robust, massive datamining jobs on the 
terabyte-size 2MASS catalogs and images data sets on-the-fly; ie in real 
time over the internet (some jobs in background with email notification
when done, if very large).  I co-designed it, and we worked closely
with Alex Szalay of JHU, standing on the shoulders of what he and his team had 
designed and developed for SDSS.  

IRSA may be able to support a large fraction, if not all, of your archiving
and data distribution needs right now (if you had the data yet!).  All
you would do is send IRSA the data, formatted appropriately of course,
and with sufficient metadata; ie data about the data.  For catalogs (tables
in db language) this comes down to a "data dictionary", which is nothing
more than an ascii file listing column names in the table, their units,
epoch, wavelength, etc., whatever is in the table.  Parallel requirements
for images (and spectra, though IRSA doesn't support spectra yet).
You also supply help files and other necessary documentation.
 
IRSA takes it from there.  Loading into the archive is a few hour 
proposition.  IRSA would then index the catalogs and tables; perhaps
a few day proposition.  You would then test the installation, and when
it's signed off by all the powers that be it can be released to the
community.  Then it can be datamined, visualized and so on.  Currently
IRSA support includes:

  - subsetting.  ie the user selects a catalog and constrains the result
    set by any parameter or combination of parameters they like; color,
    flux, latitude, etc.  

  - similar subsetting for images, by location on the sky or by any other
    feature available in the image header 

  - overlay of multiple tables on multiple images with links between; ie
    you select a source on an image and see the data record from the catalog
   
  - cross-comparisons; ie. you upload a list of your favorite objects and
    IRSA can select all sources from any catalog it has in the archive that
    fall within a given position radius (future plans will fold in 
    match reliabilites like in Rutledge et al 2000 ApJS 131, 335)

Future IRSA plans include more sophisticated and flexible versions of
all this, and transparent connection for all these sorts of functions to
other archive centers; eg. you find an interesting SIRTF source using
IRSA (or 10^4 sources!), then request back all data that NED, MAST, HEASARC, 
whatever, has for it.  IRSA has some of this already, and this kind of remote 
connectivity and data management is being protoyped by many archive/data 
centers and will form the basis for the NVO (National Virtual Observatory) 
initiative.

Let me know if any of this sounds of interest, or if you would like more
details.  For a hands-on feel you could use IRSA to browse the 2MASS data
holdings.  Any features you like about other archive center's services
will also likely be available for SIRTF data by the time we have it.

Naturally the extragalactic Legacy teams will be thinking in terms of
NED for archiving too.  In my view that should be done too and is
a highly complementary approach since NED specializes is details and
data about specific objects (a source-based archive, similar to
most other astro archives at the moment) while IRSA specializes in
really fast and efficient subsetting access to enormous datasets.

The SSC has a specialized visualizer for observation planning purposes,
and in the long run will also likely have some special features required
for data access.  In the realm of NVO it becomes invisible to the user just
which engine is supplying which data; ie. the archives network with each other
to minimize the personal information and data management that the user
has to do.  

The needs of our projects might help jumpstart the planning of what we would 
like these sophisticated data services to be able to support for SIRTF data.

Regards

Carol

--------------B02C549C7125E9A96B467290--

From - Mon Jan 29 11:09:22 2001
Received: from hydra.ipac.caltech.edu (hydra.ipac.caltech.edu [134.4.10.102])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f0TH0V410458
	for <chip@astro.wisc.edu>; Mon, 29 Jan 2001 11:00:31 -0600 (CST)
Received: from sscsci9 (sscsci9.ipac.caltech.edu [134.4.60.71])
	by hydra.ipac.caltech.edu (8.9.3/8.9.3) with SMTP id JAA15760;
	Mon, 29 Jan 2001 09:00:30 -0800 (PST)
Message-Id: <200101291700.JAA15760@hydra.ipac.caltech.edu>
Date: Mon, 29 Jan 2001 09:00:29 -0800 (PST)
From: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Reply-To: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Subject: Re: irac hex tiling
To: chip@astro.wisc.edu
Cc: sirtf@mail0.ipac.caltech.edu
MIME-Version: 1.0
Content-Type: TEXT/plain; charset=us-ascii
Content-MD5: amyk1rldifF9DM2YdCnQLg==
X-Mailer: dtmail 1.2.1 CDE Version 1.2.1 SunOS 5.6 sun4u sparc 
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000

Hi Chip,
A couple of things to pass along.
1. Regarding the short time frames. It looks like the 2 second frame (if 
offered) will NOT include a 0.4 sec frame with it. It turns out that the data 
throughput simply isn't fast enough and although 2-3 positions of information 
could be obtained quickly, large numbers of sequenced 2 second observations 
could not. We are therefore looking at about 20 seconds total to take 1 position 
in your field (2 second on sky integration). This 20 seconds includes the slew 
needed for the position.
2. Regarding hex tiling. This method of taking data was not meant to increase 
observing efficiency (in terms of laying down tiles). It does help with 
scheduling. It makes it less of a problem what roll angle the telescope is 
viewing your target fields at. This makes scheduling easier and the observations 
are more likely to be scheduled quicker.
Hex tiling is being discussed in a meeting at SSC tomorrow. If you have an idea 
about the size of tiles that would be good for you then please send it along. It 
is quite likely that there will be 3 or so tiling options -- you may well be 
able to define one of them.

Incidentally, the 2 second integration frame has not yet been implemented, 
indeed Bill Reach has asked for "ammunition" for its cause i.e. could you spell 
out the differences for your program between having a 2 second integration and 
not having a 2 second integration (a 12 sec frame instead). What will this do to 
number of saturations per frame? to number of latencies? to number of sources? 
Probably best to go from MSX data if you can.
Basically, some people still need to be persuaded that a 2 second frame time is 
worth the extra effort. 
Cheers
Tony

> Date: Sat, 27 Jan 2001 16:11:37 -0600
> From: Chip Kobulnicky <chip@astro.wisc.edu>
> X-Accept-Language: en
> MIME-Version: 1.0
> To: tmarston@ipac.caltech.edu
> Subject: irac hex tiling
> Content-Transfer-Encoding: 7bit
> 
> HI Tony,
> 
> Is there any further information about what the IRAC hexagonal tiling
> options will be like?  I don't understand how that will save time 
> given the square footprint (actually rectangular when you account for
> teh fact that the IRAC arrays are side-by-side, separated by about 1'). 
> I must be missing something.  What are the hex mapping modes being
> explored?
> 
> I'm tryig to put together an overview for our team meeting in Madison on
> Friday.
> 
> Thanks,
> CHip
> 
> 
> -- 
> 
> Henry A. (Chip) Kobulnicky  email: chip@astro.wisc.edu
> Department of Astronomy     phone: 608-265-6768
> University of Wisconsin     fax  : 608-263-6386
> 475 N. Charter St.          WWW  : 
> Madison, WI 53706           http://www.astro.wisc.edu/~chip

**************************************************
A.P.Marston			Tel: 626-395-3507
Observer Support
SIRTF Science Center, IPAC
Caltech,
Pasadena, CA 91125
**************************************************

From - Tue Jan 30 14:13:08 2001
Received: from dustem.astro.umd.edu (mwolfire@dustem.astro.umd.edu [129.2.14.31])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f0UK6H488906;
	Tue, 30 Jan 2001 14:06:17 -0600 (CST)
Received: from localhost (mwolfire@localhost)
	by dustem.astro.umd.edu (8.9.3+Sun/8.9.1/WLS8.9s) with ESMTP id PAA29998;
	Tue, 30 Jan 2001 15:04:49 -0500 (EST)
Date: Tue, 30 Jan 2001 15:04:49 -0500 (EST)
From: Mark Wolfire <mwolfire@astro.umd.edu>
To: Ed Churchwell <ebc@astro.wisc.edu>
cc: churchwell <churchwell@astro.wisc.edu>,
   whitney barbara <bwhitney@colorado.edu>, chip <chip@astro.wisc.edu>,
   mathis <mathis@astro.wisc.edu>, cassinelli <cassinelli@astro.wisc.edu>,
   lazarian <lazarian@astro.wisc.edu>, wolff <mwolff@colorado.edu>,
   dickey <john@ast1.astro.umn.edu>,
   benjamin <benjamin@wisp5.physics.wisc.edu>, seager <seager@ias.edu>,
   clemens <clemens@protostar.bu.edu>, bania <bania@ninkasi.bu.edu>,
   tmarston@mail0.ipac.caltech.edu, meade@sal.wisc.edu, brian@sal.wisc.edu
Subject: Re: The Zodiacal Light Vol 4
In-Reply-To: <Pine.GSO.4.10.10101152000140.6052-100000@dustem.astro.umd.edu>
Message-ID: <Pine.GSO.4.10.10101291840310.28727-100000@dustem.astro.umd.edu>
MIME-Version: 1.0
Content-Type: TEXT/PLAIN; charset=US-ASCII
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000


        More Notes on Zodiacal Light 
                PLUS 
         Additional Backgrounds

SPOT on Cirrus:
 1)SPOT estimates cirrus background using
   i)a refined 100 micron map from Schlegel et al. (1998)
   The map is derived from IRAS and DIRBE data and is 
   smoothed to 6.5' . 
   ii)a temperature map derived from DIRBE maps.
   iii)the intensity at any point is found by scaling it by
   the 100 um emission, and assuming it has a B(T)lambda^-2
   emissivity for other wavelengths.
   iv) 5 - 16 um PAH emission is added on by adopting a single 
   ISM emission spectrum, matched to the 12um DIRBE waveband.

The main problem with this method for our Galactic disk observations is
that the IRAC band emission is not expected to be well correlated with
the 100 um emission and thus SPOT understimates cirrus background.

One potential way to proceed is to
  1)Use MSX A band images Bandwidth = 3.36 um at 8.28 um
    MSX images are zody subtracted.
  2)Find a "typical" Galactic disk 5-16 um spectrum
  3)Find ratios of IRAC_1/MSX_A, IRAC_2/MSX_A etc for typical
    spectrum
  4)Estmate IRAC backgrounds from MSX_A background emission.

 As a very rough first guess (and I mean guess!) I estimated the
 cirrus background at gal long = 30, gal lat = 0 from SPOT as

  IRAC_4 = 159 My/sr

 I obtained the 30 0 ga MSX A band image from IRSA and 
 subtracted sources using the following IDL routines 
 (these are guestimated parameters)

; input FITS file
     filename = 'msxmapA30.fit'       
; read file + header from Goddard IDL Library    
    image = READFITS(filename, Header)    
; remove points above 3 sigma from Goddard IDL Library
 ;    sigimage = sigma_filter( image, 15, N_sigma=3, /MON, /ITER)
; smooth image  
 ;    result = filter_image(sigimage, SMOOTH = 15, /ALL)   ;smooth
; write fits file
     fits_write,'results30.fits',result,Header  


I also tried an FFT low pass filter:

; input FITS file
     filename = 'msxmapA30.fit'       
; read file + header from Goddard IDL Library    
    image = READFITS(filename, Header)    
; code scammed from IDL FFT filter demo 
    imagesize = SIZE(image)
    nx = imagesize[1]
    ny = imagesize[2]
    distfun = double( DIST(nx))
    distfun[0] = 1d-4      
    order = 3
    cutoff = 21
    filter = EXP(-(distfun / cutoff)^order)
    imagetrans = (FFT(image, -1))
    filteredImage = FLOAT(FFT(imagetrans * filter, 1))
    fits_write,'results30fft.fits',filteredImage,Header  
  
These both give about 1-1.2 x 10^-5 W/m^2/sr at long = 30, lat = 0
For a bandwidth of 3.36 microns this gives approx 68 - 82 MJy/sr
for MSX_A band. Since MSX_A band is rather close in wavelength and
bandwith to IRAC_4 these should be comparable. For some reason SPOT
is giving 2 to 3 times higher background than MSX, but this could
be due to my crude approximations or due to improper averaging.

  Mark

From - Wed Feb  7 15:10:34 2001
Received: from dustem.astro.umd.edu (mwolfire@dustem.astro.umd.edu [129.2.14.31])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f17L3rS565219
	for <chip@astro.wisc.edu>; Wed, 7 Feb 2001 15:03:53 -0600 (CST)
Received: from localhost (mwolfire@localhost)
	by dustem.astro.umd.edu (8.9.3+Sun/8.9.1/WLS8.9s) with ESMTP id QAA06428;
	Wed, 7 Feb 2001 16:03:45 -0500 (EST)
Date: Wed, 7 Feb 2001 16:03:45 -0500 (EST)
From: Mark Wolfire <mwolfire@astro.umd.edu>
To: Barbara Whitney <bwhitney@colorado.edu>
cc: brian@sal.wisc.edu, Marilyn Meade <meade@sal.wisc.edu>,
   Chip <chip@astro.wisc.edu>, Michael Wolff <wolff@colorado.edu>
Subject: Re: Data flow
In-Reply-To: <Pine.GSO.3.96.1010207121309.11388D-100000@spot.colorado.edu>
Message-ID: <Pine.GSO.4.10.10102071453160.6343-100000@dustem.astro.umd.edu>
MIME-Version: 1.0
Content-Type: TEXT/PLAIN; charset=US-ASCII
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000

Too bad I wasn't there to comment on "GLIMPSE". What does
this stand for? and who is responsible for it?
  
I think that if you have not yet read through the MSX point source
Catalog Explanatory Guide V1.2 - you really need to do so.
see http://www.ipac.caltech.edu/ipac/msx/msx.html . This gives
the complete overview of their pipeline.

Comments..
B.2.g)..subtact from frame, based on favorite model, [observation
       date], and position in sky.
C.1. I thought we were to do a type of (rapid) aperture photometry 
   (DAOPHOT ?) on the BSC thereby skipping both zody subtraction and
  high-pass filtering (maybe this was changed though on Saturday). There
  is no problem with doing zody subtraction here, but filtering takes
  a lot of time. 
D.3. Point 1 Zody subtracted here right? 
     Point2 Now do high pass filtering. Note that in my Zodiacal Light
     notes I mention the MSX filtering scheme. Really a type of median
     subtraction filter or "cascade average" filter. 
     Point 3 photometery on sources.


Level E Web modeling Tools should not be a part of the pipeline.

-Modifications for SIRTF are to be a joint effort between our 
 team and Neal's team with Lee Mundy at UMD

First Order Products:
1)Extend the model parameter range to lower Luminosity and Lower Teff
  appropriate for brown dwarfs L = 0.01 L_0, Teff = 1500 K, bracket
  and fill in the ``new'' spectral classes.
2)Add in Av = 0 spectral energy distributions.
3))Create new SIRTF specific modules:
  i)Convert units to common SIRTF values (microns, Jy).
  ii)For each IRAC band plot model intensities I vs source size 
    arcsec. Convolve model sources (at user input distances) with the 
    IRAC filters and (cleaned?) PSFs.
  iii)Enter IRAC observations in viewer and search for best fit
      models
  iv)Repeat for MIPs filters.
3)Simple fitting tools
   i)Estimate total shell mass from MIPS, single T fits from band ratios,  
     power law dust emissivities from T and SEDs.

Second Order Products:
   i)2-D analysis. Enter map and find radial profile from data.
    Subrtract off model profiles to find goodness of fit.

Third Order Products: TBD
    i)Add disk emission
   ii)Add PAH emission to spherical code
   iii)Add additional large grain models
   iv)Add PAH emission to PDR code and show IRAC bands from face-on
      and side-on PDRs 

  Mark

From - Wed Feb  7 15:20:56 2001
Received: from spot.colorado.edu (spot.Colorado.EDU [128.138.129.2])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f17LK3S564074
	for <chip@astro.wisc.edu>; Wed, 7 Feb 2001 15:20:03 -0600 (CST)
Received: from localhost (bwhitney@localhost)
	by spot.colorado.edu (8.9.3/8.9.3/ITS-5.0/standard) with SMTP id OAA04411;
	Wed, 7 Feb 2001 14:20:00 -0700 (MST)
Date: Wed, 7 Feb 2001 14:20:00 -0700 (MST)
From: Barbara Whitney <bwhitney@colorado.edu>
To: Mark Wolfire <mwolfire@astro.umd.edu>
cc: brian@sal.wisc.edu, Marilyn Meade <meade@sal.wisc.edu>,
   Chip <chip@astro.wisc.edu>, Michael Wolff <wolff@colorado.edu>
Subject: Re: Data flow
In-Reply-To: <Pine.GSO.4.10.10102071453160.6343-100000@dustem.astro.umd.edu>
Message-ID: <Pine.GSO.3.96.1010207140806.11388I-100000@spot.colorado.edu>
MIME-Version: 1.0
Content-Type: TEXT/PLAIN; charset=US-ASCII
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000


Hi Mark,

thanks for the clarifications.  We didn't remember when the high-pass
filtering came in, and obviously got it wrong.  We'll take a look at the
MSX thing.

GLIMPSE stands for Galactice Legacy Infrared Mid Plane Survey
Extraordinaire, (or something that starts with an E).  Chip thought it up.
With our short exposures, we're just going for glimpse of the inner
galaxy, see.   It's not set in stone.  If you are feeling creative, feel
free to come up with something else.  We also came up with a logo though
there's some disagreement on that--it consists of wedges of cheese, but
some quiet people who didn't speak up at the meeting later confessed they
were tired of the cheese association, and I myself would prefer a
glider (a plane with long wings) representing the galactic plane--the
glider pilot could wear a cheesehead.  

-barb

On Wed, 7 Feb 2001, Mark Wolfire wrote:

> Too bad I wasn't there to comment on "GLIMPSE". What does
> this stand for? and who is responsible for it?
>   
> I think that if you have not yet read through the MSX point source
> Catalog Explanatory Guide V1.2 - you really need to do so.
> see http://www.ipac.caltech.edu/ipac/msx/msx.html . This gives
> the complete overview of their pipeline.
> 
> Comments..
> B.2.g)..subtact from frame, based on favorite model, [observation
>        date], and position in sky.
> C.1. I thought we were to do a type of (rapid) aperture photometry 
>    (DAOPHOT ?) on the BSC thereby skipping both zody subtraction and
>   high-pass filtering (maybe this was changed though on Saturday). There
>   is no problem with doing zody subtraction here, but filtering takes
>   a lot of time. 
> D.3. Point 1 Zody subtracted here right? 
>      Point2 Now do high pass filtering. Note that in my Zodiacal Light
>      notes I mention the MSX filtering scheme. Really a type of median
>      subtraction filter or "cascade average" filter. 
>      Point 3 photometery on sources.
> 
> 
> Level E Web modeling Tools should not be a part of the pipeline.
> 
> -Modifications for SIRTF are to be a joint effort between our 
>  team and Neal's team with Lee Mundy at UMD
> 
> First Order Products:
> 1)Extend the model parameter range to lower Luminosity and Lower Teff
>   appropriate for brown dwarfs L = 0.01 L_0, Teff = 1500 K, bracket
>   and fill in the ``new'' spectral classes.
> 2)Add in Av = 0 spectral energy distributions.
> 3))Create new SIRTF specific modules:
>   i)Convert units to common SIRTF values (microns, Jy).
>   ii)For each IRAC band plot model intensities I vs source size 
>     arcsec. Convolve model sources (at user input distances) with the 
>     IRAC filters and (cleaned?) PSFs.
>   iii)Enter IRAC observations in viewer and search for best fit
>       models
>   iv)Repeat for MIPs filters.
> 3)Simple fitting tools
>    i)Estimate total shell mass from MIPS, single T fits from band ratios,  
>      power law dust emissivities from T and SEDs.
> 
> Second Order Products:
>    i)2-D analysis. Enter map and find radial profile from data.
>     Subrtract off model profiles to find goodness of fit.
> 
> Third Order Products: TBD
>     i)Add disk emission
>    ii)Add PAH emission to spherical code
>    iii)Add additional large grain models
>    iv)Add PAH emission to PDR code and show IRAC bands from face-on
>       and side-on PDRs 
> 
>   Mark
> 
> 

From - Thu Feb  8 17:20:05 2001
Received: from dustem.astro.umd.edu (mwolfire@dustem.astro.umd.edu [129.2.14.31])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f18NIHS614106
	for <chip@astro.wisc.edu>; Thu, 8 Feb 2001 17:18:17 -0600 (CST)
Received: from localhost (mwolfire@localhost)
	by dustem.astro.umd.edu (8.9.3+Sun/8.9.1/WLS8.9s) with ESMTP id SAA08110;
	Thu, 8 Feb 2001 18:18:14 -0500 (EST)
Date: Thu, 8 Feb 2001 18:18:14 -0500 (EST)
From: Mark Wolfire <mwolfire@astro.umd.edu>
To: Barbara Whitney <bwhitney@colorado.edu>
cc: Michael Wolff <wolff@colorado.edu>, brian@sal.wisc.edu,
   Marilyn Meade <meade@sal.wisc.edu>, Chip <chip@astro.wisc.edu>
Subject: Re: data reduction/database working group
In-Reply-To: <Pine.GSO.3.96.1010206124055.22314M-100000@spot.colorado.edu>
Message-ID: <Pine.GSO.4.10.10102081324400.7706-100000@dustem.astro.umd.edu>
MIME-Version: 1.0
Content-Type: TEXT/PLAIN; charset=US-ASCII
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000


Mosaicing stuff....

> Mark:  quick lit search on algorithms for mosaicing and resampling, refs
> for papers the rest of us would find useful.  could start with drizzling
> algorithm used for WFPC.  what software is publicly available? 

Promised from SSC: (SSC Pipeline overview IRAC p.8 - already 
                    mentioned by Barb and others)
  1)Reconstruct on a fine pixel scale grid in a manner similar to
   DRIZZLE in order to avoid unnecessary aliasing with large IRAC
   pixels
  2)Will be flux conserving
  3)Will have latent image and CR rejection
  4)Be written in a scalable and controllable manner to allow end-users
    to reprocess their own data
  5)Will include postion reconstruction and correction of gometric
    distortion with proper regridding onto a tangential projection
  6)Will match backgrounds between frames. The mosaicer will not do 
    background removal.
  7)No widets or GUI

DRIZZLE:
   1)Disscused in "The Dither Handbook"
     http://www.stsci.edu/instruments/wfpc2/drizzle.html
     Chapter 4 "How the Drizzle Algorithm Works"  
     Chapter 5 "Using Drizzle General Overview"
   2)Available as on IRAF add on through STSDAS V2.2 dither package
     stsdas.analysis.dither
   3)drizzle is written in FORTRAN F77! (I am astonished!)
     In our distribution it is found in:
     ....iraf/extern/stsdas/pkg/analysis/dither/drizzle/drizzle.f
   4)More info is found on "Andy's Dithering Page"
     http://www-int.stsci.edu/~fruchter/dither/

NOAO Mosaicing: (from a tip from Brian and Barb)
    1)http://iraf.noao.edu/iraf-help.html
      ->images
      ->e.g., immatch
    2)From the IRAF help files which might narrow down the 
      important packages (??)
     cl.images:
       imcoords - Image coordinates package
       imfilter - Image filtering package
          imfit - Image fitting package
         imgeom - Image geometric transformation package
        immatch - Image matching and combining package
         imutil - Image utilities package
      cl.images.immatch:
geomap - Compute geometric transforms using matched coordinatelists
geotran - Transform 1-D or 2-D images using various mappinng transforms
geoxytran - Transform coordinate lists using the geomap transforms
gregister - Register 1-D or 2-D images using the geomap transforms
  imalign - Align and register 2-D images using a reference pixel list
imcentroid - Compute and print relative shifts for a list of 2-D images
 imcombine - Combine images pixel-by-pixel using various algorithms
  linmatch - Match the linear intensity scales of 1-D or 2-D images
  psfmatch - Match the point-spread functions of 1-D or 2-D images
   skymap - Compute geometric transforms using the image celestial wcs
  skyxymatch - Generate matched pixel lists using the image celestial wcs
    sregister - Register 1-D or 2-D images using the image celestial wcs
      wcscopy - Copy the wcs from one image to another
       wcsmap - Compute geometric transforms using the image wcs
   wcsxymatch - Generate matched pixel lists using the image wcs
   wregister - Register 1-D or 2-D images using the image wcs 
   xregister - Register 1-D or 2-D images using x-correlation  techniques
      xyxymatch - Match pixel coordinate lists 

    3)Most (all ?) appear to be written in C
    4)NOAO Mosaic Data Handling System
      http://iraf.noao.edu/projects/ccdmosaic/    
      It is not clear to me how available this is. The package
      "mscred" is not found on our distribution.

MIRIAD: Mosiacing routines are here, but I rather doubt that they
        are applicable.

IDL: MOSAIC Image processing Package written by Frank Varosi
     (A very nice guy I know who used to be at Goddard now at Florida,
     Gainesville)
    http://idlastro.gsfc.nasa.gov/ftp/contrib/varosi/mosaic/README

Imaging Tools: (I know we are not doing these now but they are kinda
               neat to play with)
   1)ds9: (replacemnt for SAOimage, and SAOtng which are no longer
     supported).
     http://hea-www.harvard.edu/RD/ds9/
     -supports ``NOAO IRAF Mosaic Data Structures''  
     - Tk/Tcl application
   2)karma image processing library
     http://www.atnf.csiro.au/karma/
      -supports simple RGB overlays  kview-rgb
      -written in C

Mark

From - Sat Feb 17 12:48:24 2001
Received: from dustem.astro.umd.edu (mwolfire@dustem.astro.umd.edu [129.2.14.31])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f1CKmlS887893
	for <chip@astro.wisc.edu>; Mon, 12 Feb 2001 14:48:47 -0600 (CST)
Received: from localhost (mwolfire@localhost)
	by dustem.astro.umd.edu (8.9.3+Sun/8.9.1/WLS8.9s) with ESMTP id PAA13121;
	Mon, 12 Feb 2001 15:48:44 -0500 (EST)
Date: Mon, 12 Feb 2001 15:48:44 -0500 (EST)
From: Mark Wolfire <mwolfire@astro.umd.edu>
To: Barbara Whitney <bwhitney@colorado.edu>
cc: Michael Wolff <wolff@colorado.edu>, brian@sal.wisc.edu,
   Marilyn Meade <meade@sal.wisc.edu>, Chip <chip@astro.wisc.edu>
Subject: Re: data reduction/database working group
In-Reply-To: <Pine.GSO.4.10.10102081324400.7706-100000@dustem.astro.umd.edu>
Message-ID: <Pine.GSO.4.10.10102121542560.13093-100000@dustem.astro.umd.edu>
MIME-Version: 1.0
Content-Type: TEXT/PLAIN; charset=US-ASCII
X-Mozilla-Status: 8011
X-Mozilla-Status2: 00000000

Whoops!
  I forgot ISO. How could I forget ISO?
http://www.iso.vilspa.esa.es/archive/software/   <- all IDL though

In the ISOPHOT Interactive Analysis Package (PIA) there appears to
be a DRIZZLE thing which might be of some help.
-> PIA
-> PIA Libraries
-> PIA routines
MAPAAP2DRIZZLE 
  PURPOSE:
    Make Drizzle Script for IRAF from ISOPHOT / PIA / IAAP - Map Data

I also registered to download the ISOCAM software. It is just a cgi-bin
request form.
    Mark



From - Mon Feb 19 09:09:29 2001
Received: from mail1.doit.wisc.edu (mail1.doit.wisc.edu [144.92.9.40])
	by uwast.astro.wisc.edu (8.10.1/8.10.1) with ESMTP id f1JEw3N1302643;
	Mon, 19 Feb 2001 08:58:03 -0600 (CST)
Received: from [128.104.221.176] by mail1.doit.wisc.edu
          id IAA88562 (8.9.1/50); Mon, 19 Feb 2001 08:57:52 -0600
Message-ID: <3A913588.4AB95605@wisp.physics.wisc.edu>
Date: Mon, 19 Feb 2001 09:02:33 -0600
From: Bob Benjamin <benjamin@wisp.physics.wisc.edu>
X-Mailer: Mozilla 4.7 (Macintosh; I; PPC)
X-Accept-Language: en
MIME-Version: 1.0
To: Ed Churchwell <ebc@astro.wisc.edu>, Chip Kobulnicky <chip@astro.wisc.edu>
Subject: Saturation histogram
Content-Type: multipart/mixed;
 boundary="------------715B416CA0B9438015BEACE8"
X-Mozilla-Status: 8001
X-Mozilla-Status2: 00000000

This is a multi-part message in MIME format.
--------------715B416CA0B9438015BEACE8
Content-Type: text/plain; charset=us-ascii; x-mac-type="54455854"; x-mac-creator="4D4F5353"
Content-Transfer-Encoding: 7bit

Hi guys,

I've written the code to read in the MSX point source catalog into IDL,
and can now work with that information to estimate the number of point
sources that will saturate the detector.

The histogram I'm attaching (as a gif file) was derived by taking all of
the MSX point sources in a one degree square centered on the Galactic
plane, and calculating how many sources (in Band A) there are that were
greater than a certain flux cutoff (t=2 sec was 300 mJy, t=12 sec was 50
mJy).

For a few selected areas, I could do histograms of number of sources in
each flux bin to estimate completeness, but look over the attached
figure and tell me what you think. Is this good or bad?

Bob


--------------715B416CA0B9438015BEACE8
Content-Type: image/gif; x-mac-type="47494666"; x-mac-creator="6F676C65";
 name="msxsat.gif"
Content-Transfer-Encoding: base64
Content-Description: Unknown Document
Content-Disposition: inline;
 filename="msxsat.gif"

R0lGODdhgAIAAvcAAAAAAAQAAwkABw0AChIADhYAExsAFx8AHCQAICgAJi0AKzIAMDoAOz0A
P0AAREQASEUATUgAUUoAVk0AW08AX1AAZFIAaFMAbVQAdlYAelcAf1gAhFYAiFcAjVcAkVcA
llUAmlQAn1QAo1QAqE8AsU4Atk0AukwAv0cAw0YAyEQAzEIA0TwA1joA2jcA3y4A6CsA7CgA
8SQA9SEA+hkA/xUA/xAA/wwA/wQA/wAA/wAE/wAQ/wAV/wAZ/wAd/wAm/wAq/wAu/wAz/wA3
/wA//wBD/wBI/wBU/wBZ/wBd/wBh/wBq/wBu/wBy/wB3/wB//wCD/wCH/wCM/wCY/wCd/wCh
/wCl/wCu/wCy/wC2/wC7/wDD/wDH/wDL/wDY/wDc/wDh/wDl/wDp/wDy/wD2/wD6/wD//wD/
9gD/8gD/7gD/4QD/3AD/2AD/1AD/ywD/xwD/wwD/vwD/uwD/sgD/rgD/qgD/nQD/mAD/lAD/
kAD/hwD/gwD/fwD/ewD/cgD/bgD/agD/ZgD/WQD/VAD/UAD/TAD/QwD/PwD/OwD/NwD/LgD/
KgD/JgD/GQD/FQD/EAD/DAD/CAD/AAT/AAj/AAz/ABX/ABn/AB3/ACr/AC7/ADP/ADf/AD//
AEP/AEj/AEz/AFD/AFn/AF3/AGH/AG7/AHL/AHf/AHv/AIP/AIf/AIz/AJD/AJn/AJ3/AKH/
AKX/ALL/ALb/ALv/AL//AMf/AMv/AND/ANT/AN3/AOH/AOX/APL/APb/APr/AP//AP/6AP/y
AP/uAP/pAP/lAP/dAP/YAP/UAP/HAP/DAP+/AP+7AP+yAP+uAP+qAP+lAP+hAP+ZAP+UAP+Q
AP+DAP9/AP97AP93AP9uAP9qAP9mAP9hAP9ZAP9VAP9QAP9MAP8/AP87AP83AP8zAP8qAP8m
AP8iAP8dAP8VAP8RAP8MAP8AAP8AAP8AAP8AAP8AAP8AAP8AAP8AAP8AAP8AAP8AAP8AAP8A
AP8AAP8AAP8AAP8AAP8AAP8AAP8AAP///ywAAAAAgAIAAgcI/wABCBxIsKDBgwgTKlzIsKHD
hxAjSpxIsaLFixgzatzIsaPHjyBDihxJsqTJkyhTqlzJsqXLlzBjypxJs6bNmzhz6tzJs6fP
n0CDCh1KtKjRo0iTKl3KtKnTp1CjSp1KtarVq1izat3KtavXr2DDih1LtqzZs2jTql3Ltq3b
t3Djyp1Lt67du3jz6t3Lt6/fv4ADCx5MuLDhw4gTK17MuLHjx5AjS54M8t/Af5gvY7asebPn
z6BDix5NurTp06hTq17NurXr17Bjy55Nu7bt27hz62ZtkDOAzZ1918z8+7JAzsJ9Kzd+nHnx
5tCXQ39OXXp159azY5+unft27+Cvh/+X3l28+fLovz9PP149+/PM38t3Tx/8/Pb44edHXl+/
//viAfjecfxFNx1NlhVYXHL9CbhfgxA+aKCE/0VY4YQXZuigfRZuqGF8HYZIIXkifjjidx6m
GKGK4S3oHYMIYpggQSzqV+ONKJaIo4Q7mnhhj0CeKKSPJA4ZJH5HEpmjkfUpOKNzMn0W4IFH
JrmjlTouqSSTPGbJ5Y9ebgnml1jKGGaVZ2Ln2ZTU2eQkhmJ2V2acZKbZZZ14sklnnkXu6Wef
c7IYqJdJgjihcMN1FhyNJiEqkqOVnQTpR5NS+uiljWaqKUmVetQpR44qR9xvwCn16Uanorop
p6uOlGpFr1L/FCtGs1pUq62tYsqqV7fKKmmuIfU6kbDDQiQlQ8Q2lGxEyz7UrLPARlrSs0ZR
i+yv02K7a7bQHnhQqdJyu+24upIb7FfWUuaUdQg9qS5e6Q615rtjsdsbuPTKNW9X8eaLlL29
temvvugOXC+U3wps8Fv9BtXwwkIBXJC7EDNccMW8IhzwwxhDxbFPH3e8k8SMhizyUiaPfPJW
JBuX8spHvZyTzDBHqfHECtdMFs038ayzSy035/PPIF9M9FRBu3h0WUPHuLRUSVP8NFhNz1T1
1Nt+KjXW/KKLL9f/3rwo2FztWzbZTUWdM9pXXR2T22yDKrbLcZ+dcd1he7sx3lrB//2S33zj
qjfOgAcebduGF6V24Wdp/TXVRifu8NxCD6z14Hd3LXnElCtN7+MJ30scuKDnrfnmQC2+c+kq
IQcazgF77i7jGtHeOuqTY073wWvfTuqxmK8ppe1yZ457T4uPKq/Zxfae0qmV8rdc0vJ6rfzx
OAUtfLWdX+s8SqW/PnGppF8fM+tWEY996N/PqL5D1C+kIMzvH76+0+17Xr3u8PMPcf3iut/M
Ouc+7vnPewBkSwJdJUCV+a+AojMf/pY1v5UtsFwNjNK+Lrc181htgxep4MkueK4M4o9RCoEg
7L63EkhR8IAGI2G4TPg29rVLf+qxmg2bJ8PGRY6Gf9vh3v9c2D3frRB4CPxZDz0FRJvFLiEq
RCELjSjF+MHJgj9sIkuImEIctsiJ4yNdt3qFxMUssSNnnEsZB/jEG3YwO8x7XreUBcMnphFl
1rujW+CIvi0KkUbA4aJ/WjjHJErEin6JY1b0CJcBgVGKbsyZI+XYv0qSsYiCYSSt+CYqMSaq
jQl7Y38IWUk6TtGOj9FkCDkpP0WScoWRFGR5Xuk9U16yjoFRpeDqFivACTKW7JslFeU3xuad
MpdZJFsvH0lAL2aIlsS0pDF1qbhkgm2ZNQTlEIOZw2F2UZqHxCQyjcc2bMLkl6GsDgi/SElT
2nKaqbQm18wZRG0SzoOj9CYUixn/TlwChpq+whs9gfbHkuEzP9D85jv7ecx/yhNrAz2kK0sJ
yXRKTJjtrKUhmSVOh/Kqj0SLKEf9ac9ObW9wfJTgtyZK0WgudKQN5QtLqwJQtYjUWB0tqSJV
KMuConKXGo3mLWOayIdO7aZzTNbltonSm70KkTds6TeHWlPOkRNtSC2lUl1q0Is6VaurlOo+
iXrQxFQVpnHLqju3qtCufrWpaw2rO9s1L6rG86rKLCQ8YeXS0JTVq3EFKleFaFfHnBWnAtUr
Q9k61uvMjpv2hCxfxVrR9q2TrDI16tPUWkvGRtWxf30rXT052bkStq/dVMxhFZtXyiZVsD91
EWAl2dac/0bWp3pb6iDNqNmlcRa1pf3s9EKL0jiik6FB1aZuMWrW3h7ttwr1rGR5KtnPijag
plUucMuKmNW6FqKsRSxmH7idx8bWunANo0rFqdtmIpS3H12vb8P72uBC9qS0JS8sRevCmVZ2
v/l772H8izRWfjew2BUu3Wbb3vRWEbdQ3OltKcQY72a3tRcWr3RjS93znrak1zVmZZeb2ubi
9Zr0Bat9OSy76n4YwMRdscJIzE4Tny6tKUawiKfbYg9rF8QO3nFutwvVv1g4uRhGMrI2SODf
yRc+5j3iYPMr5QlfOFREtm1fjjzlJHdZyZg053AZPOXjxjjBGqMxdwfs3NY1ef8t0IXxfyH8
4MqRubZUrrOcWYvl6Ja4u21uJ5fN1VjxorfQWY6yng9t5tmiech+rjGgT3xOLZslznMOc31l
y98y/zGlL/xxY5m7xi0HGnzBGbSlDnzoPbu6ypxOr+PI9+k/C3nGqW7QZa9W6qSoerS0M/P5
QApbRB/4qfXFb0/BCWPmPhrXQ9Izry09M2JDLXt0tup4I2xtss5avmJecKeZ/V9nT9O4JZI2
QUn6k19nO6HbNtabsduvoRr6y7jUjqJtHbtG8xumJk13PgXtsVNrK9NopLaKi4fWHCM83HYe
90vL/W8NR/qZA0c1u4tG6Xq+WlUbt3jCketwykE81lT/xqa/Jb1XBVM449o6rLut3BJhM7G4
3QYkaUHecFabfNMdhvVGKc7yxV58krsl+FNm/nE/0rx2Er93yPGcYXz3+7KdFbes+dnsim+a
xwJOOref/HWmMB3h6256Ru7c83i/W+1wf1O+yxtjlde66ABP4a5LbG4f07vgHU872nm+7LbX
+9Zg7rfX27NvvKNw5Ws2et5rDOrtylXmBgfWy9gudbc//fNxD7vLUV74JUuwk6Mq8sWBHnX3
ej7yBrzxCRUucqHz+eZtTzzs+g7roC96l6W/vOSdHHwClW/nwAe87HUIeuH7HcmHJ7nPzTT3
F9Ud6lvHPlERqbYglxbz8Q32/9udb3uxRj/3Vt/94gMUyNZ/38XJn7yO4f961Y8s50vHNuh7
vfr1l3veVKd7rRZVvKduCSJhU1d+sFd7Zdd/fkct9oc8mRdA7GVbnJdjEIh46fd466dv8/d+
z9dyDThqlkd7/pc6E0hoYtZkF3hs2td5AmgoC0gfqRKBDwiADph1Czd6g7eDZpeCDLR/79aC
VZeAPdh8FSh2o9dBISh/WTN8OkiCSCiF6wKEGFR9akeEupeB0leE6ud4NKgsOMiDQbh9SRhg
eRZ/VRh4Nfd2NqeA9tdgMhaDQqiEPNY0NgiFY6OAZPiA2gd+y8dMWHiEWph+XIh+ARg6BRiG
ryQzgP9VfFTYh/VngvoXiNkUep9HhKUmh8/WWTNld2DIeE73eh+4HvQnib9nhCfYblZYQpiY
he53ZuOXiHqHfHW4iKLYiDGniKfYi5T3h8pnN27ihkMYi442i8Y2h0mIi1A2io74VpCIinwH
jPkXfp/0ioRojCE2hQOogdXHjOSBf4S3i4rXhHw4jWtHiQgijmlTiUeYhpGIjvAIdxuIgVzH
fXSni5vCRdHoi381hqvIcZZYaXUIi9kHh/XohTC4jB2Yj0bkiAjYj+bYfX9XjQPpce/4hql4
fcb3ZIe4SbT4hTOYiw/JfBJ5jnjHWIAojNeYkcV4kOo2fXTohaA4ks2oj9n/dJIbuZMKl4c6
cXbqiHsumYnaGIrHhIDpGJIcaJT6Rna4VzgiZJMUyYkj6GutOENnmI0wCXPEOI+dyJBMSXc+
45PFo5P/RpEi+INsOIpDaZApB3YKKYPvuIX3eIZjVpJOZJYp6XppiUe+xmSARI8ah42atpWi
15UauZDf2JDWN5ZBCZJ6CXtoqYd+SXwI45RtWDlwoj6JuY2SyHZxFpXWQpW8GJaNiZc56Y88
uZcguIYP1ifXWCQwMowFqZVvyWIyKZo8143lKJViiZpbVFeqeZafqIbtGJNR+TZvMpvic4lt
aZuQCI5cN5eGWJf5RhqkWJUHZ5jxCFv8Z5Q80ZwE/2J9j5lwwxWQFDiIhXmbvVdyV6SKfClU
6Kl1g+k2fYaS+Cl1UxmMu6M/72Ne88OZn4Z16xmdjDlxQbmJ1hlvUbSPGMmd0ih9+2mRBnUo
tNljAeqOEteZHNmeuel9SYmJzAhMSpeZRHeUCTqR5cl8oGWhw3F8e5idDHeix9idHRqaIAqS
IjqfEVeibAmhK8WOjOZ6gMhkqFeZLbmhL8meMRmX7ymjOVqaNkmi9fmgTJpQE+qaLDl7B8mh
mnigQ7eiXimlPtmg4kJGAJlmw3mFWXqcFyl4SkqU3Cmd5CamHGqK4GlRwKmdUhWZWCmZYuqc
LKOhXbqkBmqaCAqfQPZSZf/qTGVYWCvmp6u2mlOKgmsJb4XnpUXpm3WKc5jZdczWqEyoK5D6
nQAmqULJmlAqiItEqOypqXMKpvK5qPYGlpXKVFUKP3unnlfqTW2qlm9qojTqmfQHmu6Jp6Dq
bbkWqrRnpk9ofrLaqxmlqivJMkLqisMapQhZqB86j3GoZXLnba/jmLxqh6JGqebyq/9yrY2S
pkr5o9zqlpm6q06KrNnqhAtaq6PqiiJFp//HriF6loFKkD2DKAArmNsZr9AZTEiJo94KrhD7
H8VZobl6ZdEKQEeqX6sqqCyKjMnIsa8apOBGrGuKopYJpDm4UcAzmfsaLv16sQ4EbTZqlZeq
T5n/anU1OrNduZHfunHJKbAUS44Wi6gDS41oR5au+qKfqphwqrC4lbMRSpgdyoDT6Y8Gu7Ep
e3ecSp17iobV2jOOWmwge7O0CLUlG1GFmLVTVYKg1LKT+rJEq6j8amVIC7Yq47ZdOLZwyZtm
a47P+Ys+G7Fqhl54i0Zv1l+2aGwYm2YNy58Fe7DcmJ4hW7Yk67fLqrhqkrhRiFjLhZSaGZ7H
ep+VGHCWuz+gO6lJ6rQT1rf5KbIri5sIe6v2qrUVVbgEO5Oia7fOg6oCuaUdG6cfC7ilWJFN
yrWy+7MgerUX1Es7hW4/+XOlq23VBrnqlbqTG7zncbgJ6ryy6IOdmqyP/9d+EtiFpMtGu1uy
IEO9l2K7xzqtqutqI8qjtXen6CqlrYZO7Nu0Q8ubl1i+9Wu6A5S/9eq+18u3AVm3UUi/B9xH
kPe5rtK8oFOr/LO4E4y+lnp/DSOgtBqfHoqvc6utOhuwISbAxMuzt+a/uovCTOmu9kNTrkq2
2Bu/edqaiPupCEy7l4m12zqmVKfCsdnDdnm6z4utXFrAT3vARVu8O/sxDRy2I/eqY/iGFHy+
0XvDf3qhqFvEMGzAMyy7LUea0XvCO2S7o+G96gSwUhyzPoyPckvEj7u0MknAW3zEXWzFVAjG
rStj+Guy8uqx0PeuQMNSr4uFCQSUbTyjwMvFx/+bxFxJyFeYhmRsqH7cZT4cMwdayFeZxe/7
cEh8yHeckF4MrW3LxwsbuZQMyBfMxjr8gtkjnjpqvXO8up28yo3Mx0yMw5EspzwMKwQau2oc
xDFrvsiLiPoby/A7y5sHtMPLykGWy31symZ8uZaMqJj8y6TIwqm6ydC7yJ68hKBsxycavpkB
t5ubxFakS/76n+obLAeYnRqcrKZavj1Ly4fpyG4MyZLUy6fEujqKbDS7tdUsxE8Myx4rzxFL
z+Z6lNgMxKNszP68y/0cx0MM0AI9vZrMqoOMiDIcysyiz8ZbhuHsTKRmxiFzzgttoqoc0AEM
pe8ctYo8z9OGygmLzw7/TdKPmrcCmdIVDbYkDMoE/L/HXMeMHJK208SiJLxsu8qqp0fpvNPD
2NMyPZjAJsFKHM0tXNS4bMR1VHmkitPjS9HBbNHZzKqI3MFU+9NDbXhjrNX7LL9nPZMpDMwT
7btkvZuw+9Yz/dGPvMc1jWDPyG5MfclOrUGuLMK/O9a17NKPrNf3zNeXy8/1/MS3EtjUPNgT
hNi3e9GJbcEDPcmNvdZf6tdC274XqtNhHdeGC8eEVtZVvcySy9hXzI/iK60PDc6K7ctgZNpv
LMTnZ72svdlhjNndLFch3Xjdq3Opl9a3StlgPddi3dmHDd2tXc5oPdzF5tixmoy2zdnMrdvm
/0vXIPvbkT3V+gvbF53Rn3uo96vcSx17UePRRYwVLa3Z4+3cEeRLJWjcfcu7JSzRP6yx5r3a
iKO7VwzcSevZ4v1F+l25/N2XcF3aHIzQYjvgWEzfCf3GmLbY3bTg2trglPng/42GAQ7Sg1oZ
7FjSRye9pJ3aHpnDob3e1h3cEv62Ea7SJb5qVJ3gG22lAyzctsfhPOzhHgzilw3gyq2MH6Ta
Pc653rh23Lvd90zkdt1/BxjBDM7ZrbniRS7iR/6VOgTV2BtWOa7JO17ePu3jv1eDVy7jWe7f
W86JNs7TLF1CY57NZS6sWj7l8ajmnpq7XSwrONjdNW7ZX87S6/ykUv8uZHcOr0ue4FVGYJMp
rQSubZE+4x2t5G6WwXTe5GW96PCW6Ia95659skKe1zktzZVb19Gt59hX59Dt6foE6q+c36OO
3Fj+6ae+qCOu4avOzCDn6qAinH9u5lEt3WTI55MY446OwaeHw5NesFGelMCO424d62du7C6G
7Ie4vI990lKd6uG9joeOtcPMv9IC69Ud5iRO5bVu1SGO7t8OwuS97q167pxO7cOO527O6tne
7v5OsEh32hB960yrnOPOMeWO4AGFeks07dHuYdputNZ84RUu7wSf5xXL75B57zeHzhxf4P1O
3f0tzAYe3Qqc7/ue8b7e6h9flqbS8mi+4f//ntSoTfEEzY1Qruwh2tsj5/A9//JeLeAQP/Nq
++bVLscFzcgLNO5O1vEwz/L/XPC8/ujEVrc5P471ffOxu93eThQIH7i+4/FBT+/HTvQhbPQo
j6lJr/OF3PXWnfDQPFliT8xkH/I0/+E1D++Sos+Q+vAVP+suP/b4bjpS7/dpbva3DfAlD+E4
r/QXrPFi/vTSDvR0P/WHL/IOnvdH74xrT8syxPOBX/lOn77N6fMhBN9Dj/l4z/g2P7qdbzJt
j+nXXrUpLzgkdJ+mr4YnB0NW3+U0vPk4abxXb8jkDvaUdPtsnsyV3YO9r/NGq/ddq6xsH55+
xcqmGqa1L/esmMe4/y1/uz9FzW/pNIz6vP36Qp/bqdqo0n/82w/Uws+Cgs386nj1Eq/waXfy
HJ39Z5r+zWr8Gof8AAFAoMB/AwsORJhQ4UGFDREyZOjQ4ESCEhdSxGgRokWOCTd2BBlSZMOP
EiOORJlSZMmHKlmqBHkS5syQL2lmBGAz5j+eB2XGvAnTZ1CiNS9WTPmzo06SGJU2RYrTIdOk
UotedcrxKVauLaN6RUn16tauM3uW7Tn068qjYcsuXfu2qEyxJl1ahZoTb16fZ+HGFZpWLte6
ZAcT1WmYr1zBhx3fPFl3atuRiruqfRyU7l6NdwEv/gyac9bMpdmGRm1aqFXLHkcjVu2yMf/W
yK/z2qZcGnPsqq5TT+6tl+Bs0sKBrlUsmXfmwsvnsvZsnLFztgVbny5eObfR2MSpHwd7Hbdv
4zZLtn6ZfPx3tKPFsyf/8315x/NVW5f+PHz09f3hL9/st9uwO68t5aKq7a/8/mPOPQajk8+7
zgSE7MGprLNvwuyw829BCxkM0EMFtUNQqgK5y089Cj+ELbUM4WtOo9leRJHFxxIUUavtwLMR
RAP5I3BD+lZMDzwaezRSRySVzNHFAdtjcasjcTqQvA6nXJKmtEKcr8viuByvSAWxzFI04Mo0
80krO3TLRqXITPHKHUdE0zQp5QzuxP2IpDLJOglz8E+PJFxzRzj/z4wSIp4A3bPNhwhFVNAb
NfQyT6ca03PMQtOUVMtAO3U00hXNytKvy+IDctNHTQX1sDtHxXNI3zLVyjsVm2wVRbIO7TFC
Vtkk8UNeL1xU1mDVBCvXSe2CtVlZ5SvRWYN+PXNYNGNUlsdPL6MWRGuTNZbDOYHNNtQfgws2
sWhxrZFZdsutlkl43QV33LGWLPYtHCsVVdV573WX33She7bFWrv9l1J5Ex7U1F0RNhjJb/dN
tV5/Ga4w4Io1BQyzKjXEmFFcv+0Vt4mvHZZidO19N2RzUV1ZV0I9Jrdmlzm9OOQDT64zX/2E
1DZnkv99teWc+wWO1tVupm1bpoFGNmKU/wGGeuH4Znz6Z5zpbHdCpTfO2lKQw955urAj/Ziz
Las+u+tGK4M06qO+jrltR3e1O1x6Re41blLfFtfPvOtmO+i9vZ4W4mMHh1txo+ctW99S9eJV
5Zc5ZnxxmP82PGmzM5fc7sihlJjyUwF3m8mhIVfY09RJctx10Ek/e/TTJcbw9nU1x3x2rlG/
HGkAfaedbJM/ZxzTWIMk/vfCnZdbt9ibD/7mtTvXcvrv/OZ898B7p17utFm22LnVBz8/W55L
x49vvbHXOPzDgeddeN7SF11++zNm//F2x/ff+/TXpOt1z2rUwV/bEtiq9ZWsfU2j3wFVN8Do
UQ1696uflbTHOv8Klk9qbvKZBQUoQRltcHbpQ8+DrmOYfC0qhExbIKgaiL7NZbCDYHPf2LZn
Q9N5D4Y3tNn8LOTCytXwe0DEIQTh152VFGtLEYFWw/rixBeWKYadmmGU1NZCLvrMcjxE4uty
KMThHbFQERqOYAC4QyQ20GFdTCBV+jKk3WDIYUkM4xJFqEMEpquAcTLJA6X1nytKan1z/Mhu
6pO7pD1QkBuJYvXyKEYlXpCJZkzWUyBZkTX2sY2fQ+REoHgf7mzyUsQR2CQJpzsSMuePS6li
eCSEKb+Y0EefHMsrhWPKQa7yXD0sUSTBqEoyEoZ7hdwfMYP4NF/FUlsFGmWDeJTIrwj/cnnK
xGToinlJbPJRf5HMUDSjpUhXxW0z1BRlBdXZTQ8ib53SZCexnOk7cHLunBRBZiDf+CjXCDOb
8WynNpNpJ4BaEnT1XFpOsMZP1vmTkgXtZUIHqhuIepN4CMUje3SpGQ897I4VXQj3ikc+goL0
nXnDqC+FdSqHbi6fPzRfK7lp0oAedGt6VCFLo0c3iOYTb7ekaU0zl1JJElKkVWlpo15qPU9u
k5RBFWrybmrQH7a0gJ3EZRmdWlKoRpSpv1QpM6ll1WUO0KcydeU8e9pBou5ErTA6qlvIClaa
ntWiGOyqV13W1n9qtKzpNNRUgbhRu26VonkNYO0Ee1dC/pWT/2riax7VFVPGPjWvSy0ZXYe5
PUY2ba5GVOVktTpReHYVs25arGH92p7PRjCrSS3tSeuD2PLEFaag7StTW/s8tp7yrYP5aWMR
y1MFppa05rNtdSBrXLMm7rfLUi10TctbZjKXpDu0Jmx268NJnnZ/3k1saKl7W9ei1a/Z5eh2
R5hVLVaWq9PlLkqtezSNdvZe6t3oDfNr1G6BF7wYI65iNZvbvXZUtuy91oGBS9sAG2/AD4Xh
WBWsX0NO2JjPZWeDsxbZEv6XieqNp4d/518Gj/eruIWwbpd7o+RWWFCwxetlTVzgNLbQgPIF
8e1EvMfJXTe2QdVwdTt24/zlWGQ7zv+eLWFk4ZHWdcY6mxmRh+hYYFoMhVRerQyZzEogP5mG
Eh3iE4toZCUiWcoJrjGJh+tl+YK5vZIjM9XM7OY/YXXBa46v/NCjxhMa2Mf82++Lc2Vnd3Y5
z+FL4WPx1WKgxFlrWI4xFiHNUTyvl3qBps+cw2sUR39w01Nm4KT5B19Lf3OCmibZLLf8PU2n
edVN/S+jiRnkSytJ1pZl7Ypn+2dYv5qyn76zjA/dXIWh+tad6TSl6bvkIYdar002Ka2bF1z0
FjfZoxZ1mX2t1R23etBsHuqp+6ZQJcPl2rKL6iL7SzAtP5vLTh62qYvd53MTuUvHdulCl41a
d48x2uCW6rz/rQhnXbtKwYReV71z2u9KQlXaFxX3ohWq08BKN1ZY+hqMewzsQsO71HqG3R1R
TWX0apzH/MI40BRVbqB2u8TxBnlgR87wKrPb4LyGueA4LGiaP9rQH0f0clvNch0pvGIo/5lo
vQ0+oJIa4QrU96roXfBgp7u8zPMzx4WrdWiD9Dz4Rp850cytF5rc54l9esazLT2i66vtYRTt
qjB80bezeOKAMnrd9vxRZSudtlbHZtwBHm58kTzrmD45q5PO7qWr7+VZvzqxS0fzkq+94oZL
OXefDvfHf7bxTQfhE+87X08net8TbDbXOV9pzwd+6g+ueph8rfaeU/DzLob84AMe/+5mxtDs
qQc04/9ueZsCX/df5v1Kffx7zO3c46aNMuwpbFMPWzXqy6S96hE8/E1tvrjUV373Vb741N/e
2dzXtfmzLNXqp9/mSdG38/+NfvcrU/25nLvFy//+yyUG7HCvO4CSP0QLQLcTPbwLPysbP3sj
vtWjP/GrPfLiN+1TtIWDwPd5kQHkvvuDFw2MucmjwJpjtgsUvP5rwO17QA8MulLJP05LQN/K
vqM7wcF6wMvjwF9jvxfUPP6TJ7+rweNyONKDOBZMmRBUNuApwXjZvx/ctm5SwVorvGpLMh3E
QB4UjSesNCbEwiHsnyJ6MyS0wl/aQlLTQiGkp8mRwjNjI//cSsIrNMMgZEIEuT7JsqIWxKlI
W8Dci5/Di0Oc8zjmW0HCo0IfXLbsu0Gi6cMqtL+Nq5wCTLwlLMQ8PET1cUQnDEOzqsQLQ7yw
Gi1JXCdDTETA+zlAhEIQ7Lo1BMOO8RtQDMUIpEPjQ4z/m8DdAzU2dBqXesOfK0NY7DudIUI7
NC883EEn2cMxhMM4bEPZmcQm1CYvHEThuytWbMVlPD9SFJyEmbkQdLkBwxY3lL4UTMRktCdf
LDzKm0VPjEZ0nMZwvMSEosbTQ64i/EJ1tB9pDMV3lDReDD4A27hTbKpUHJnW4cNWNELxUsUC
9D4LzCyBUkjncr6iIcR7ZEdi7EX/fpQ4A4w1CGkle9TCTFxEitxHyPFIsgNG9xLGaxQfepxI
ZHQPfEtI0GszKoQlx4FIaFzHPqySDJzBw8Idj9zGjvuSXHy+H8xJZSTHseOxEWRIXPxG+sNH
3DM9jbRIpDw7pTxFjsTJcLQtnXTFf+zHqly/q1TJrCTIzVJChjG2kjTJmRJLzZPFinrKDTPK
qaTFhny3oCzLYMzLT3vJrVtIZ6zFpVSqvVzLvOTKggxLFRKzu0xMf0s4woyusqSLY9rJH5NJ
sETFtgS6m4RMHcKWuERMlFFLfzxCMexMuTtNSuG7s+zAkdREwLRLxyyY1BRFzgwR1kTEctTG
c2TM2aTN/650upBaN+DsxDeDTZgco/j7zcosqEAzRt0ct9FkxqSUs1l6y+EDzWkTyoWEzoZD
Tm1bTrMMTxK8TquMycAknewUxPHkHWs0ReUrT+LMqLlkT6qqTwX0Q+6sRXIqze+Us/u0TwDV
w9Bky4V7yZ9sRgEtzPvMu3lUzM0kMFxLTwWNzPrEr/i8udDrOQzFNh2jUCn60IOxMRusQ+lU
FgSd0BCFRwVNwr4ESgG7TPJTUeaswRal0fmksRg1GPWsyxnFGXDiUNmUSwc9Mh+9UafkQfeU
0PPURBx1RyOVT4nkRSV9L+Q7nVTyUCjl0VLEr69kUgjC0iLVUijdQ/xc0QL9Nv+GGo4zLSUn
lUoj3VLtnNLpZCUcWdNEaQl0ikD+DNDAcE2yJFNupLov9CI6wtNxqiazCdNAFcxAtdH8fK8R
3aUovRvAksPy5E/CYlTG2EQVfVQ2LSdbyQpxskBegtA24as4FbZNzUMz1U9oqs1dM1Tp4JlU
ZVVZvdVPjdUqPRE+zTJ0IlVGsdVbjb1N1dUjfSbS8FVUfKNCDZ1hJdZGJdNjpVQwgyI44iAo
wahOjVY3ZdEkpVMhFTJt9cZuLVZGpVYC9bTvI1fTNNdzdVRwhVSe7FGA2dZ3hddplVdQpVcr
FdZyxdfehNN93dV+/VJ7BdiA9U50JVhk7VO6/Fd3VVj/cZ1RTb08/UQpn4REVb2sP7XQQfUW
E03TdmXKiV1YhW1Qy2TXK42/IA1YjqXBi+XN/FlKFzVZfh1YmSXSlc0hm71Zh+VMV51ZnvVO
n/1ZdQ3PlNU/mh0po/1ZmJ0+cqsibl1SpuUyqj1aToxWbkXRg8XMrM1XsNXLqiVa6hTbFz3b
ClVZGBXYtKVYtw0TlwXaeDxOuG1Su73DU20cqJ3XscVbOvvbfXNavsXZBQ3cogpc01sdwi1Y
vz1c8XRbxcVVfz3Zx+1Py+UT4GRcx8JazM1buJXcDK1XdPPct7Xb3js+x8VG0y1dxP3blZPU
we2zym1d0i1dQnTZzWU43ZXM/9odyyyyWqldVN9Vw8ONyIMsSd79oggl3odN2+MdSG/Fxlq6
puaVDZGdWMJStaYUTuXNt/6SW8zlXUCNPCBEy5KF3fHdS/XdRRT7XIjVE6clXvYlyjf03sHM
OesFXP01kjlk3vPFX73l3xQbYFvcX+O5KrwsYNpd4B8t3ura1vBtXvqt0XY03NV9zgYmYA0W
R9VFxAzWYOct4A6+4A/ezhAuYf4lYbUlGgmr1vn12MS14O59PSmi4OW8YaeMPuk1YRQuTh/W
2nDtGaQF4r4F4nCq4SI2WCX+37kdnhz+UCgmSKxVXuxl4ve9YkMR1eLL4rXt4hHrEy7+YtEd
Y8VDjv/ZLeOwTeP6c+KTXGOzfWMSLNwTjWNprWMztdOws+I1lmAVBo0+fs87XldBZjw+E2NC
vlxEntP7VeREVmSyYuRGtl1Jtr5IluQDJmTYsuRLDuI31mQ05mQe/uL0ZeFsDeVO5uOj2uRT
3mBWbmM0dWUPPuUq3uM0BuQrvuWhjeVSDuVV3mVe5mRf/mUh9mRQHuYU7mVjPmbzdWVhXuZX
9uNDfmYjpmRlnubGvWRnnmYpjmJrvuYXZmJtfmZuplBaJufxzGUlTmcdHedvZubcdOc5bmRx
XuZzFlB6PmZ7BlB8HmZ9ZlBv/mZ//lhpjmeBZk9+/mWDRmeAvmaFTlqG3ub/eKbmQYthXK7o
Ll5n9JRoh8ZhiG5nicZmOgZpaNZfhN5ljv5Nk45llKZNlW7mkSbpJXZnlk5Nl2Zlmj5Nm55l
mAbn2JxpniZijC1ooDbngr7oLM5onw5oovbor2VgOH5qp4bqSZ5qqR7ktrXqq47qEyNjNa5q
rf5qRwZrqibNrBbrrR7rtG5NeRZhTA7rDrVj1kVl1zVrssZqtT5rEcrOOvJiuX7gt/7ruqZr
twZswhZsw8ZrdEvDNBWn+FVgmnnMyPZNx0ZUyabsyX5sZc1sy95szPbsz77s0Obs0QbtzRZt
0j5tz07t1e5sPWVt0jbl11bt1qZt1Man2i5t267s/9zm7deW7d82bdwG7tEe7t6u7eJGbs3W
bd6ObeHGy+RebsqGbuMmbueO7uC+7uyebe2ebte2burebvDu7tvmbgXOzcb+bsgW7/Qm7/Uu
78ge7/eeVPmO7/h27/m+b/tWb/0+bvaW7PMOYN/27/xub/5+bwN3bwQfbgW3bgY/8AGvbwhP
3TDzIjGz8AvH8AzX8A3n8A738A8H8RAX8REn8RI38RNH8RRX8RVn8RZ38RdHpVoG6hmn8Rq3
8RvH8RzX8R3n8R738R8HUalNHMigJdglcmdNoyMnolpqu+spchrZYnJT8imicuiMzyd/zSRP
z0yckVrGcvxjcvUE1vxFHP+kWFYCid0W4aUpsZwjiQz1pk8zx50Jl3MB/osD1dNHS0i1OPO/
kd/zylObcSJLBbYQejjYuQhCq/BEzZ5At3OGUp6YNhZ5xHMybzRGnwvq7TdHCum5kXTyc6Eg
CvUK1Dr01itnTbt+Cmk+t/QLybROT1DDa/WdeHSo4Ov/9D4iotUsDerRWptUN1U2D+CQTPVB
6XQ7GnWuq41g3U9Yx3Rr4XQwZxVor/UfYfaK7HVYhnNLGfNxNO9QuXW+JPRo549owqo1r/O/
5Fz31ci+zPMjJHf9YHW++fP7+fVmnXItF3KzQCWpS7IlpyK1vPcwh/JfWbl8d/Kj7h5MHfhD
SXjGaq+xLJfyu8XQN8dpIMf4jNf4jef4jvf4j283mL74EM7Axc72p210FgJ5r9ajke8usHZ5
y7V454p4yhn1g9d3km8Ymt93O8JvfF95Pa/zeY92ou/pbk0Qo5/Ubp/3oId38i76WeVzhUfZ
PRkKamL6mnd6bFN6Vs96/NZ5r+j6Chz7k9/xgYd6TQf4Ic95DlajEa3yXUJ2tp/4rXfjpbb7
Oru7jd77vJ8akY95vxf8wSf8wjf8w0f8xFf8xWf8xnf8x4d8SQ4IADs=
--------------715B416CA0B9438015BEACE8--

From - Tue Mar  6 09:08:02 2001
Received: from astro.wisc.edu (churchwell.astro.wisc.edu [144.92.179.174])
	by uwast.astro.wisc.edu (8.11.3/8.11.3) with ESMTP id f26ESVV1636835;
	Tue, 6 Mar 2001 08:28:31 -0600 (CST)
Message-ID: <3AA4F54C.726F37DB@astro.wisc.edu>
Date: Tue, 06 Mar 2001 08:33:49 -0600
From: Ed Churchwell <ebc@astro.wisc.edu>
X-Mailer: Mozilla 4.75 (Macintosh; U; PPC)
X-Accept-Language: en
MIME-Version: 1.0
To: whitney barbara <bwhitney@colorado.edu>, chip <chip@astro.wisc.edu>,
   mwolfire <mwolfire@astro.umd.edu>
Subject: [Fwd: TNX issues]
Content-Type: multipart/mixed;
 boundary="------------716C7990132E280D4161E885"
X-Mozilla-Status: 8001
X-Mozilla-Status2: 00000000

This is a multi-part message in MIME format.
--------------716C7990132E280D4161E885
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit

This from Tony will be of interest for geometrical projection
corrections.
							Ed
--------------716C7990132E280D4161E885
Content-Type: message/rfc822
Content-Transfer-Encoding: 7bit
Content-Disposition: inline

Received: from hydra.ipac.caltech.edu (hydra.ipac.caltech.edu [134.4.10.102])
	by uwast.astro.wisc.edu (8.11.3/8.11.3) with ESMTP id f25LMqV2221764
	for <ebc@astro.wisc.edu>; Mon, 5 Mar 2001 15:22:52 -0600 (CST)
Received: from sscsci9 (sscsci9.ipac.caltech.edu [134.4.60.71])
	by hydra.ipac.caltech.edu (8.9.3/8.9.3) with SMTP id NAA14182;
	Mon, 5 Mar 2001 13:22:49 -0800 (PST)
Message-Id: <200103052122.NAA14182@hydra.ipac.caltech.edu>
Date: Mon, 5 Mar 2001 13:22:49 -0800 (PST)
From: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Reply-To: Tony Marston <tmarston@mail0.ipac.caltech.edu>
Subject: TNX issues
To: ebc@astro.wisc.edu
Cc: wolff@colorado.edu
MIME-Version: 1.0
Content-Type: TEXT/plain; charset=us-ascii
Content-MD5: mYDLONKMphi7H9Oa7DttSQ==
X-Mailer: dtmail 1.2.1 CDE Version 1.2.1 SunOS 5.6 sun4u sparc 

Dear Ed,
Following up the issue of FITS keywords and the use of TNX projection for IRAC 
maps, I asked Dave Shupe for a summary of the present status of TNX projection 
information to be supplied in the FITS headers of files and which software 
currently supports TNX deprojection.
The attached is his reply. It may be useful in constructing your piepline.
Cheers
Tony

------------- Begin Forwarded Message -------------

X-Sender: shupe@pop.ipac.caltech.edu
Date: Mon, 05 Mar 2001 12:59:16 -0800
To: tmarston@ipac.caltech.edu
From: David Shupe <shupe@ipac.caltech.edu>
Subject: TNX issues
Cc: David Shupe <shupe@ipac.caltech.edu>
Mime-Version: 1.0

Hi Tony,

here's some notes about SSC plans for distortion keywords, and software
available for reading them.

Dave

SSC plans for representing distortion
-------------------------------------

The BCD processing will not re-grid data onto a TAN projection, so the
distortion in IRAC (~1 pixel at the edges) will be represented by
distortion keywords in the headers.

The SSC Downlink group would prefer to use distortion keywords supported
by Mark Calabretta's WCSLIB library.  Mark is reluctant to change the
API to his library until the proposed standard is ratified.  In addition,
there is currently more software supporting the IRAF "TNX" keywords
than the proposed FITS-standard PV keywords (see below).  Finally, the
IRAC instrument team favors use of the TNX keywords.

We have adopted the following strategy: Use TNX keywords to represent 
IRAC distortion, but plan to switch to PV keywords in the future.  Developers 
writing code that deals with coordinates should make it easy to e.g. swap 
header reading and writing subroutines to handle either projection.

In addition, we will limit use of the TNX projection to the polynomial
function, with xxterms and yxterms = "half" in IRAF parlance, and
order < 7.  This will ensure that the distortion as represented by
TNX keywords will also have a PV-keyword representation.

Software supporting distortion representations
----------------------------------------------
(note: we don't include the Digitized Sky Survey (DSS) projection
here--it is similar to the PV-keyword method but is not exactly
the same)

TNX is of course supported by IRAF.  However, it is our understanding that it
is considered an "experimental" coordinate system by the IRAF group.

TNX is also supported by Doug Mink's "wcstools" library.  His library
is used for SAOimage and SAOtng, so both programs can interpret TNX
keywords.

The AST library developed and distributed by the Starlink project has
support for PV keywords and common forms of the TNX projection.  See
note from David Berry appended below.

The AST library has been used in the DS9 image viewer (available
at  http://hea-www.harvard.edu/RD/ds9/ ).  I have confirmed that
this viewer interprets TNX keywords (and should handle PV as well).

Appendix: Note from David Berry regarding AST library
-----------------------------------------------------
Date: Thu, 23 Nov 2000 10:27:44 +0000 (GMT) 
From: David Berry <dsb@ast.man.ac.uk> 
To: fitswcs@cv.nrao.edu 
cc: David Shupe <shupe@ipac.caltech.edu> 
Subject: Re: distorted TAN projections for SIRTF 


If it's any help, the AST library developed and distrubuted by the UK 
Starlink project has implemented all the proposals of WCS papers 1 and 2 
(excluding the pixel regularization image). This includes the PVi_j terms 
for the distorted TAN projecton, and multiple WCS representations. AST can 
also read the common forms of TNX and ZPX projections (but only writes TAN 
and ZPN). It will also read (and write) various old WCS encodings such as 
those which use CROTA or PC keywords to represent rotation, etc. 
AST includes other WCS facilities as well as simply reading and writing 
FITS headers, and transforming between sky and pixel coordinates. For 
example, it can convert between most common celestial coordinate systems 
and also draw coordinate grids for any arbitrary (potentially 
discontinuous) mapping, including all-sky projections etc. The new DS9 
image browser from SAO uses AST for these reasons. AST is written in C but 
has both C and Fortran interfaces.
If anyone wants further information about AST, the current version of the 
documentation for the C interface is available at
http://www.ast.man.ac.uk/~dsb/sun211.htx/sun211.html	
A slightly older version of the documention for the Fortran interface 
is available at:
http://www.starlink.rl.ac.uk/star/docs/sun210.htx/sun210.html	

David Berry


------------- End Forwarded Message -------------


**************************************************
A.P.Marston			Tel: 626-395-3507
Observer Support
SIRTF Science Center, IPAC
Caltech,
Pasadena, CA 91125
**************************************************

--------------716C7990132E280D4161E885--

From - Tue Mar 20 12:05:03 2001
Received: (from majordomo@localhost)
	by uwast.astro.wisc.edu (8.11.3/8.11.3) id f2KI2MD1211326
	for sirtf-mumble; Tue, 20 Mar 2001 12:02:22 -0600 (CST)
Received: from mail1.doit.wisc.edu (mail1.doit.wisc.edu [144.92.9.40])
	by uwast.astro.wisc.edu (8.11.3/8.11.3) with ESMTP id f2KI2LF1205766
	for <sirtf@astro.wisc.edu>; Tue, 20 Mar 2001 12:02:21 -0600 (CST)
Received: from [128.104.221.176] by mail1.doit.wisc.edu
          id MAA252518 (8.9.1/50); Tue, 20 Mar 2001 12:02:19 -0600
Message-ID: <3AB79C66.9E1D3CAE@wisp.physics.wisc.edu>
Date: Tue, 20 Mar 2001 12:07:33 -0600
From: Bob Benjamin <benjamin@wisp.physics.wisc.edu>
X-Mailer: Mozilla 4.7 (Macintosh; I; PPC)
X-Accept-Language: en
MIME-Version: 1.0
To: sirtf@astro.wisc.edu
Subject: Galaxy analogs
Content-Type: text/plain; charset=us-ascii; x-mac-type="54455854"; x-mac-creator="4D4F5353"
Content-Transfer-Encoding: 7bit
Sender: owner-sirtf@uwast.astro.wisc.edu
Precedence: bulk
X-Mozilla-Status: 8001
X-Mozilla-Status2: 00000000

Rob Kennicutt during his review talk in Wyoming this summer tapped the
following two face-on galaxies as one which might resemble the Milky
Way.

NGC 3351
NGC 7331

-Bob

